GTR at Elstree and Borehamwood
All trains at Elstree and BorehamwoodGTR across BritainEast of England
How this operator is doing here
GTR had 68,122 scheduled stops at Elstree and Borehamwood in the 13 periods to Period 7 of 2026-27, 100% of the station's total. 70.9% of recorded arrivals came within three minutes and 6.6% of stops were cancelled.
GTR trains at Elstree and Borehamwood also serve Radlett (4.4 km north-west, 72.1% on time, 6.5% cancelled), Mill Hill Broadway (5.0 km south-east, 70.4% on time, 6.6% cancelled), Hadley Wood (7.3 km east, 89.5% on time, 4.6% cancelled), New Barnet (7.4 km east, 86.8% on time, 4.8% cancelled), Harrow and Wealdstone (7.7 km south-west, 84.8% on time, 6.8% cancelled) and Potters Bar (7.8 km north-east, 85.4% on time, 5.2% cancelled), which are the stations on its network closest to Elstree and Borehamwood.
Within 30 km of here, GTR runs best at East Dulwich, 25.4 km south-east (96.0%), and worst at Mill Hill Broadway, 5.0 km south-east (70.4%).
The busiest GTR station within 30 km of Elstree and Borehamwood is London Victoria, 19.9 km south-east, with about 692 scheduled stops a day.
Of the 1 operators with enough records at Elstree and Borehamwood, GTR is the most punctual, at 70.9%.
GTR at Elstree and Borehamwood has not moved in one direction over three full railway years: 81.5% within three minutes in 2023-24, 72.6% in 2024-25 and 73.2% in 2025-26.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 5,464 | 69.5% | 5.4% |
| Period 6 of 2026-27 | 5,235 | 65.2% | 7.1% |
| Period 5 of 2026-27 | 4,907 | 68.1% | 9.1% |
| Period 4 of 2026-27 | 5,305 | 68.4% | 4.4% |
| Period 3 of 2026-27 | 4,313 | 70.3% | 5.4% |
| Period 2 of 2026-27 | 4,773 | 71.9% | 4.5% |
| Period 1 of 2026-27 | 6,008 | 74.7% | 4.9% |
| Period 13 of 2025-26 | 5,975 | 75.7% | 4.7% |
| Period 12 of 2025-26 | 5,487 | 75.0% | 5.6% |
| Period 11 of 2025-26 | 5,518 | 68.0% | 8.3% |
| Period 10 of 2025-26 | 4,337 | 73.9% | 9.2% |
| Period 9 of 2025-26 | 5,368 | 69.5% | 11.0% |
| Period 8 of 2025-26 | 5,432 | 70.9% | 6.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out