Transport for Wales at Earlestown
All trains at EarlestownTransport for Wales across BritainNorth West
How this operator is doing here
Transport for Wales had 13,180 scheduled stops at Earlestown in the 13 periods to Period 7 of 2026-27, 35% of the station's total. 74.5% of recorded arrivals came within three minutes and 1.5% of stops were cancelled.
Transport for Wales trains at Earlestown also serve Newton-le-Willows (1.7 km east, 73.6% on time, 1.5% cancelled), Warrington Bank Quay (7.6 km south, 74.4% on time, 1.2% cancelled), Runcorn East (13.8 km south, 75.5% on time, 0.9% cancelled), Runcorn (14.2 km south-west, 86.2% on time, 2.6% cancelled), Frodsham (18.2 km south, 79.2% on time, 1.7% cancelled) and Liverpool South Parkway (19.7 km south-west, 81.4% on time, 2.9% cancelled), which are the stations on its network closest to Earlestown.
Within 30 km of here, Transport for Wales runs best at Bidston, 29.6 km west (87.3%), and worst at East Didsbury, 27.9 km east (60.1%).
The busiest Transport for Wales station within 30 km of Earlestown is Frodsham, 18.2 km south, with about 70 scheduled stops a day.
Transport for Wales at Earlestown has slipped a little, from 77.7% within three minutes in the previous 13 periods to 74.5% in the latest 13, a fall of 3.2 percentage points. Cancellations fell to 1.5% of scheduled stops from 2.1%, which is 0.6 percentage points fewer.
Period by period
See how Transport for Wales Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,026 | 68.2% | 0.8% |
| Period 6 of 2026-27 | 1,052 | 63.1% | 1.5% |
| Period 5 of 2026-27 | 1,019 | 67.5% | 2.6% |
| Period 4 of 2026-27 | 1,046 | 69.9% | 2.4% |
| Period 3 of 2026-27 | 1,016 | 67.3% | 2.3% |
| Period 2 of 2026-27 | 999 | 72.6% | 1.1% |
| Period 1 of 2026-27 | 1,182 | 83.9% | 0.7% |
| Period 13 of 2025-26 | 1,061 | 87.3% | 1.6% |
| Period 12 of 2025-26 | 765 | 87.4% | 0.7% |
| Period 11 of 2025-26 | 1,016 | 85.5% | 1.4% |
| Period 10 of 2025-26 | 981 | 81.2% | 0.6% |
| Period 9 of 2025-26 | 978 | 63.5% | 2.0% |
| Period 8 of 2025-26 | 1,039 | 72.7% | 1.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Earlestown
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 24,183 | 70.4% | 3.1% |
| TransPennine Express | 2 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out