Northern at Earlestown
How this operator is doing here
Northern had 24,183 scheduled stops at Earlestown in the 13 periods to Period 7 of 2026-27, 65% of the station's total. 70.4% of recorded arrivals came within three minutes and 3.1% of stops were cancelled.
Northern trains at Earlestown also serve Newton-le-Willows (1.7 km east, 68.1% on time, 2.9% cancelled), St Helens Junction (4.6 km south-west, 68.4% on time, 3.0% cancelled), Garswood (4.7 km north-west, 89.6% on time, 2.4% cancelled), Bryn (5.5 km north, 89.5% on time, 2.5% cancelled), St Helens Central (6.1 km west, 88.1% on time, 2.5% cancelled) and Warrington West (6.4 km south, 66.5% on time, 3.5% cancelled), which are the stations on its network closest to Earlestown.
Within 30 km of here, Northern runs best at Thatto Heath, 8.2 km west (90.7%), and worst at Moses Gate, 19.5 km north-east (52.6%).
The busiest Northern station within 30 km of Earlestown is Manchester Piccadilly, 27.1 km east, with about 508 scheduled stops a day.
Northern at Earlestown has edged up: 70.4% of stops came within three minutes of the timetable in the latest 13 periods, 4.9 percentage points better than the 65.5% of the 13 before. Cancellations fell to 3.1% of scheduled stops from 6.1%, which is 3.0 percentage points fewer.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,899 | 69.8% | 1.9% |
| Period 6 of 2026-27 | 1,852 | 72.2% | 2.2% |
| Period 5 of 2026-27 | 1,677 | 72.8% | 4.4% |
| Period 4 of 2026-27 | 1,735 | 73.9% | 2.9% |
| Period 3 of 2026-27 | 1,702 | 70.7% | 1.7% |
| Period 2 of 2026-27 | 1,860 | 74.1% | 2.2% |
| Period 1 of 2026-27 | 2,194 | 77.7% | 1.6% |
| Period 13 of 2025-26 | 1,998 | 76.8% | 2.4% |
| Period 12 of 2025-26 | 1,900 | 77.7% | 2.3% |
| Period 11 of 2025-26 | 1,885 | 73.4% | 2.0% |
| Period 10 of 2025-26 | 1,722 | 66.3% | 5.7% |
| Period 9 of 2025-26 | 1,874 | 48.6% | 5.3% |
| Period 8 of 2025-26 | 1,885 | 58.7% | 5.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Earlestown
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 13,180 | 74.5% | 1.5% |
| TransPennine Express | 2 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out