TransPennine Express at Eaglescliffe
All trains at EaglescliffeTransPennine Express across BritainNorth East
How this operator is doing here
TransPennine Express had 12,095 scheduled stops at Eaglescliffe in the 13 periods to Period 7 of 2026-27, 31% of the station's total. 68.1% of recorded arrivals came within three minutes and 1.8% of stops were cancelled.
TransPennine Express trains at Eaglescliffe also serve Yarm (4.0 km south, 61.4% on time, 1.7% cancelled), Thornaby (4.5 km north-east, 70.2% on time, 2.1% cancelled), Middlesbrough (9.2 km north-east, 72.8% on time, 6.2% cancelled), Darlington (12.8 km west, 74.7% on time, 3.3% cancelled), Redcar Central (20.4 km north-east, 73.8% on time, 10.7% cancelled) and Northallerton (22.8 km south, 68.6% on time, 2.3% cancelled), which are the stations on its network closest to Eaglescliffe.
Within 30 km of here, TransPennine Express runs best at Darlington, 12.8 km west (74.7%), and worst at Yarm, 4.0 km south (61.4%).
The busiest TransPennine Express station within 30 km of Eaglescliffe is Northallerton, 22.8 km south, with about 41 scheduled stops a day.
TransPennine Express ranks 2nd of the 3 operators with enough records at Eaglescliffe, on 68.1%.
For TransPennine Express, Eaglescliffe is the 45th best of 77 ranked stations. Its 68.1% here is 0.7 percentage points below the 68.8% across the whole network.
TransPennine Express cancels fewer trains at Eaglescliffe than elsewhere: 1.8% of scheduled stops, against 3.3% across its network and 1.7% for every operator at the station.
Period by period
See how TransPennine Express Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 951 | 63.1% | 1.9% |
| Period 6 of 2026-27 | 940 | 67.6% | 1.7% |
| Period 5 of 2026-27 | 944 | 63.6% | 3.1% |
| Period 4 of 2026-27 | 949 | 64.2% | 1.5% |
| Period 3 of 2026-27 | 952 | 79.1% | 0.2% |
| Period 2 of 2026-27 | 788 | 60.9% | 2.7% |
| Period 1 of 2026-27 | 1,047 | 70.3% | 2.1% |
| Period 13 of 2025-26 | 1,050 | 73.9% | 1.1% |
| Period 12 of 2025-26 | 952 | 71.6% | 0.8% |
| Period 11 of 2025-26 | 950 | 76.2% | 1.8% |
| Period 10 of 2025-26 | 870 | 73.7% | 0.1% |
| Period 9 of 2025-26 | 915 | 57.5% | 1.9% |
| Period 8 of 2025-26 | 787 | 59.8% | 4.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Eaglescliffe
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 23,473 | 85.4% | 1.5% |
| Grand Central | 3,968 | 57.9% | 2.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out