Durrington-on-Sea
DURSouth EastManaged by Govia Thameslink Railway (Southern)
How this station is performing
Durrington-on-Sea had 46,702 scheduled stops to Period 7 of 2026-27, about 128 a day. 77.6% of recorded arrivals were within three minutes of the timetable and 3.9% of scheduled stops were cancelled.
Durrington-on-Sea opened on 4 July 1937, 89 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Durrington-on-Sea is the newest; the oldest, Worthing, opened in 1845.
The nearest stations to Durrington-on-Sea are West Worthing (1.3 km east), Goring-by-Sea (1.5 km west), Worthing (2.5 km east), East Worthing (4.0 km east) and Angmering (5.4 km west). 8 stations lie within 10 km in all. At 77.6%, Durrington-on-Sea is less punctual than all of them; the best of the five, East Worthing, manages 83.5%.
Durrington-on-Sea is named after Durrington, a suburb, home to about 5,528 people, but the station stands 2.0 km from its centre.
For Durrington-on-Sea, the weakest four-week period in the data is a recent one: Period 6 of 2026-27, when only 68.7% of stops arrived within three minutes of the timetable. The strongest was Period 2 of 2023-24, at 86.2%, which is 17.5 percentage points higher.
Compared with 3 stations of a similar size in South East, Durrington-on-Sea is the least punctual, at 77.6%. All of them are ahead, including Goring-by-Sea (78.1%), Farnham (84.9%) and Dover Priory (78.4%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 46,702 | 77.6% | 3.9% |
Operators with their own page for this station are linked to it.
Late train at Durrington-on-Sea? Delay Repay
These operators call at Durrington-on-Sea and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,512 | 72.2% | 3.2% |
| Period 6 of 2026-27 | 3,581 | 68.7% | 4.7% |
| Period 5 of 2026-27 | 3,596 | 73.9% | 3.8% |
| Period 4 of 2026-27 | 3,623 | 79.0% | 3.0% |
| Period 3 of 2026-27 | 3,616 | 75.3% | 3.7% |
| Period 2 of 2026-27 | 3,556 | 78.9% | 6.1% |
| Period 1 of 2026-27 | 4,054 | 82.5% | 3.2% |
| Period 13 of 2025-26 | 3,789 | 84.2% | 4.1% |
| Period 12 of 2025-26 | 3,623 | 82.1% | 3.0% |
| Period 11 of 2025-26 | 3,545 | 82.1% | 3.2% |
| Period 10 of 2025-26 | 3,228 | 79.1% | 3.4% |
| Period 9 of 2025-26 | 3,486 | 72.2% | 5.6% |
| Period 8 of 2025-26 | 3,493 | 76.7% | 3.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Goring-by-Sea | 46,702 | 78.1% | 3.9% |
| Farnham | 46,641 | 84.9% | 2.5% |
| Dover Priory | 46,556 | 78.4% | 1.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out