Dore and Totley
DORYorkshire and The HumberManaged by Northern Trains
How this station is performing
Dore and Totley had 16,677 scheduled stops to Period 7 of 2026-27, about 46 a day. 67.2% of recorded arrivals were within three minutes of the timetable and 2.2% of scheduled stops were cancelled.
Dore and Totley opened on 1 February 1872, 154 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Sheffield is the oldest (1838) and Hathersage the newest (1894), with Dore and Totley in between.
The nearest stations to Dore and Totley are Dronfield (4.2 km south-east), Sheffield (6.6 km north-east), Grindleford (7.8 km west), Hathersage (9.1 km west) and Darnall (9.3 km north-east). 5 stations lie within 10 km in all. At 67.2%, Dore and Totley is less punctual than all of them; the best of the five, Darnall, manages 83.2%.
Dore and Totley is named after Totley, a suburb, but the station stands 2.6 km from its centre.
3 operators call at Dore and Totley: Northern (72.2%, 68% of stops), TransPennine Express (62.1%, 20% of stops) and East Midlands Railway (45.9%, 11% of stops). The operator you travel with matters: Northern reaches 72.2% within three minutes while East Midlands Railway manages 45.9%, a gap of 26.3 percentage points.
2 of 3 stations of a similar size in Yorkshire and The Humber are more punctual than Dore and Totley on 67.2%. The comparison group includes Marsden (Yorks) (67.2%), Scunthorpe (76.8%) and Thirsk (67.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 11,370 | 72.2% | 2.0% |
| TransPennine Express | 3,392 | 62.1% | 2.1% |
| East Midlands Railway | 1,915 | 45.9% | 3.8% |
Operators with their own page for this station are linked to it.
Late train at Dore and Totley? Delay Repay
These operators call at Dore and Totley and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,293 | 66.2% | 1.9% |
| Period 6 of 2026-27 | 1,293 | 68.5% | 1.3% |
| Period 5 of 2026-27 | 1,262 | 65.2% | 4.0% |
| Period 4 of 2026-27 | 1,276 | 66.5% | 1.1% |
| Period 3 of 2026-27 | 1,294 | 63.1% | 1.4% |
| Period 2 of 2026-27 | 1,297 | 65.7% | 3.9% |
| Period 1 of 2026-27 | 1,486 | 72.3% | 3.0% |
| Period 13 of 2025-26 | 1,246 | 71.1% | 0.8% |
| Period 12 of 2025-26 | 1,261 | 73.2% | 0.7% |
| Period 11 of 2025-26 | 1,227 | 73.8% | 2.1% |
| Period 10 of 2025-26 | 1,175 | 64.1% | 3.2% |
| Period 9 of 2025-26 | 1,285 | 60.4% | 2.8% |
| Period 8 of 2025-26 | 1,282 | 62.6% | 2.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Yorkshire and The Humber
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Marsden (Yorks) | 16,541 | 67.2% | 2.8% |
| Scunthorpe | 17,087 | 76.8% | 2.4% |
| Thirsk | 17,241 | 67.5% | 1.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out