Dorchester South
DCHSouth WestManaged by South Western Railway
How this station is performing
Dorchester South had 22,581 scheduled stops to Period 7 of 2026-27, about 62 a day. 74.1% of recorded arrivals were within three minutes of the timetable and 4.5% of scheduled stops were cancelled.
Dorchester South opened on 1 June 1847, 179 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Dorchester South is the oldest; the next oldest, Moreton (Dorset), dates from 1847.
The nearest stations to Dorchester South are Dorchester West (0.4 km north-west), Upwey (7.0 km south), Moreton (Dorset) (8.7 km east), Weymouth (10.4 km south) and Maiden Newton (12.2 km north-west). 3 stations lie within 10 km in all. At 74.1%, Dorchester South is less punctual than all of them; the best of the five, Upwey, manages 86.9%.
Dorchester South is named after Dorchester, a county town, home to about 21,358 people, but the station stands 0.2 km from its centre.
Across the whole run of data, the weakest four-week period for Dorchester South was Period 9 of 2024-25, at 55.4%, some time before the latest year. The strongest was Period 12 of 2024-25, at 84.4%, and the two are 29.0 percentage points apart. Cancellations peaked at 10.3% of scheduled stops in Period 9 of 2024-25, against 4.5% over the latest 13 periods.
2 of 3 stations of a similar size in South West are more punctual than Dorchester South on 74.1%. The comparison group includes Bodmin Parkway (69.4%), Avonmouth (74.6%) and Clifton Down (77.0%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 22,581 | 74.1% | 4.5% |
Operators with their own page for this station are linked to it.
Late train at Dorchester South? Delay Repay
These operators call at Dorchester South and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,704 | 72.2% | 4.3% |
| Period 6 of 2026-27 | 1,724 | 83.8% | 1.0% |
| Period 5 of 2026-27 | 1,732 | 74.9% | 4.4% |
| Period 4 of 2026-27 | 1,693 | 62.1% | 5.4% |
| Period 3 of 2026-27 | 1,622 | 70.3% | 5.9% |
| Period 2 of 2026-27 | 1,730 | 66.1% | 5.5% |
| Period 1 of 2026-27 | 1,999 | 83.2% | 2.7% |
| Period 13 of 2025-26 | 1,897 | 79.0% | 3.1% |
| Period 12 of 2025-26 | 1,726 | 78.9% | 6.6% |
| Period 11 of 2025-26 | 1,725 | 78.5% | 7.1% |
| Period 10 of 2025-26 | 1,545 | 74.2% | 3.2% |
| Period 9 of 2025-26 | 1,740 | 70.6% | 4.3% |
| Period 8 of 2025-26 | 1,744 | 66.4% | 5.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Bodmin Parkway | 22,490 | 69.4% | 6.0% |
| Avonmouth | 22,464 | 74.6% | 4.2% |
| Clifton Down | 22,718 | 77.0% | 3.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out