Dodworth
DODYorkshire and The HumberManaged by Northern Trains
How this station is performing
Dodworth had 11,897 scheduled stops to Period 7 of 2026-27, about 33 a day. 74.7% of recorded arrivals were within three minutes of the timetable and 1.4% of scheduled stops were cancelled.
Dodworth opened on 1 July 1854 and closed to passengers on 29 June 1959. It reopened on 15 May 1989, 37 years before the latest figures. Among the 5 stations nearest to it with a known opening date, Penistone is the oldest (1845) and Silkstone Common the newest (1984), with Dodworth in between.
The nearest stations to Dodworth are Silkstone Common (2.3 km south-west), Barnsley (3.8 km east), Darton (4.9 km north), Penistone (6.3 km west) and Wombwell (8.2 km east). 7 stations lie within 10 km in all. Of the five, Wombwell is the most punctual at 79.7% and Silkstone Common the least at 72.7%, with Dodworth on 74.7%.
Dodworth takes its name from a Village called Dodworth, home to about 9,777 people, and the station stands 0.8 km from its centre.
For Dodworth, the weakest four-week period in the data is a recent one: Period 9 of 2025-26, when only 59.7% of stops arrived within three minutes of the timetable. The strongest was Period 6 of 2025-26, at 84.2%, which is 24.5 percentage points higher. Cancellations peaked at 11.9% of scheduled stops in Period 8 of 2023-24, against 1.4% over the latest 13 periods.
2 of 3 stations of a similar size in Yorkshire and The Humber are more punctual than Dodworth on 74.7%. The comparison group includes Silkstone Common (72.7%), Penistone (77.0%) and Berry Brow (81.9%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 11,897 | 74.7% | 1.4% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 851 | 77.1% | 1.6% |
| Period 6 of 2026-27 | 912 | 78.3% | 0.9% |
| Period 5 of 2026-27 | 912 | 77.6% | 1.5% |
| Period 4 of 2026-27 | 912 | 79.3% | 0.8% |
| Period 3 of 2026-27 | 912 | 76.3% | 1.9% |
| Period 2 of 2026-27 | 909 | 70.9% | 2.0% |
| Period 1 of 2026-27 | 1,049 | 79.8% | 1.6% |
| Period 13 of 2025-26 | 1,002 | 82.2% | 0.5% |
| Period 12 of 2025-26 | 908 | 72.7% | 0.9% |
| Period 11 of 2025-26 | 898 | 76.1% | 2.4% |
| Period 10 of 2025-26 | 826 | 73.1% | 1.8% |
| Period 9 of 2025-26 | 902 | 59.7% | 1.9% |
| Period 8 of 2025-26 | 904 | 65.9% | 0.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Yorkshire and The Humber
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Silkstone Common | 11,897 | 72.7% | 1.4% |
| Penistone | 11,901 | 77.0% | 1.5% |
| Berry Brow | 11,785 | 81.9% | 1.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out