Dent
DNTNorth WestManaged by Northern Trains
How this station is performing
Dent has usable figures for 12 of the last 13 four-week periods to Period 7 of 2026-27, covering 4,982 scheduled stops, about 14 a day. In those periods 77.5% of stops arrived within three minutes of the timetable and 1.0% of scheduled stops were cancelled.
Dent opened on 6 August 1877 and closed to passengers on 4 May 1970. It reopened on 14 July 1986, 40 years before the latest figures. Of the 5 stations nearest to it with a known opening date, Dent is the newest; the oldest, Clapham (North Yorkshire), opened in 1849.
The nearest stations to Dent are Garsdale (5.0 km north-east), Ribblehead (8.5 km south), Horton-in-Ribblesdale (15.4 km south), Kirkby Stephen (19.2 km north) and Clapham (North Yorkshire) (19.9 km south). 2 stations lie within 10 km in all. Of the five, Clapham (North Yorkshire) is the most punctual at 82.0% and Ribblehead the least at 75.8%, with Dent on 77.5%.
Dent takes its name from a Village called Dent, home to about 785 people, and the station stands 5.8 km from its centre.
1 of 3 stations of a similar size in North West are more punctual than Dent on 77.5%. The comparison group includes Armathwaite (77.7%), Langwathby (76.3%) and Lazonby and Kirkoswald (76.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 4,982 | 77.5% | 1.0% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 380 | 71.3% | 0.5% |
| Period 6 of 2026-27 | 380 | 82.5% | 0.0% |
| Period 5 of 2026-27 | 380 | 82.2% | 0.5% |
| Period 4 of 2026-27 | 380 | 80.0% | 0.5% |
| Period 3 of 2026-27 | 380 | 75.5% | 0.5% |
| Period 2 of 2026-27 | 380 | 71.6% | 3.4% |
| Period 1 of 2026-27 | 436 | – | 0.7% |
| Period 13 of 2025-26 | 419 | 83.7% | 0.0% |
| Period 12 of 2025-26 | 380 | 83.4% | 2.9% |
| Period 11 of 2025-26 | 380 | 82.1% | 1.1% |
| Period 10 of 2025-26 | 327 | 75.0% | 0.0% |
| Period 9 of 2025-26 | 380 | 71.5% | 1.8% |
| Period 8 of 2025-26 | 380 | 69.2% | 0.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Armathwaite | 5,291 | 77.7% | 1.0% |
| Langwathby | 5,291 | 76.3% | 1.0% |
| Lazonby and Kirkoswald | 5,291 | 76.8% | 1.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out