Armathwaite
AWTNorth WestManaged by Northern Trains
How this station is performing
Armathwaite has usable figures for 12 of the last 13 four-week periods to Period 7 of 2026-27, covering 5,291 scheduled stops, about 14 a day. In those periods 77.7% of stops arrived within three minutes of the timetable and 1.0% of scheduled stops were cancelled.
Armathwaite opened on 1 May 1876 and closed to passengers on 5 May 1970. It reopened on 14 July 1986, 40 years before the latest figures. Of the 5 stations nearest to it with a known opening date, Armathwaite is the newest; the oldest, Wetheral, opened in 1836.
The nearest stations to Armathwaite are Lazonby and Kirkoswald (7.9 km south-east), Wetheral (9.1 km north-west), Carlisle (13.7 km north-west), Brampton (Cumbria) (14.3 km north) and Dalston (Cumbria) (14.5 km west). 2 stations lie within 10 km in all. Of the five, Dalston (Cumbria) is the most punctual at 93.4% and Carlisle the least at 74.7%, with Armathwaite on 77.7%.
Armathwaite takes its name from a Village called Armathwaite, and the station stands 0.3 km from its centre.
1 of 3 stations of a similar size in North West are more punctual than Armathwaite on 77.7%. The comparison group includes Langwathby (76.3%), Lazonby and Kirkoswald (76.8%) and Wennington (83.4%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 5,291 | 77.7% | 1.0% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 404 | 73.0% | 0.5% |
| Period 6 of 2026-27 | 404 | 85.4% | 0.0% |
| Period 5 of 2026-27 | 404 | 82.8% | 0.5% |
| Period 4 of 2026-27 | 404 | 80.9% | 0.7% |
| Period 3 of 2026-27 | 404 | 77.5% | 0.5% |
| Period 2 of 2026-27 | 400 | 76.1% | 3.5% |
| Period 1 of 2026-27 | 464 | – | 1.5% |
| Period 13 of 2025-26 | 445 | 82.4% | 0.4% |
| Period 12 of 2025-26 | 404 | 80.9% | 1.5% |
| Period 11 of 2025-26 | 404 | 79.8% | 1.0% |
| Period 10 of 2025-26 | 346 | 74.7% | 0.0% |
| Period 9 of 2025-26 | 404 | 70.3% | 2.2% |
| Period 8 of 2025-26 | 404 | 67.1% | 1.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Langwathby | 5,291 | 76.3% | 1.0% |
| Lazonby and Kirkoswald | 5,291 | 76.8% | 1.0% |
| Wennington | 5,518 | 83.4% | 0.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out