Danby
DNYYorkshire and The HumberManaged by Northern Trains
How this station is performing
Danby has usable figures for 2 of the last 13 four-week periods to Period 7 of 2026-27, covering 3,779 scheduled stops, about 10 a day. In those periods 77.9% of stops arrived within three minutes of the timetable and 1.3% of scheduled stops were cancelled.
Danby opened on 2 October 1865, 161 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Castleton Moor is the oldest (1861) and Commondale the newest (1882), with Danby in between.
The nearest stations to Danby are Castleton Moor (2.3 km west), Commondale (4.5 km west), Lealholm (5.5 km east), Glaisdale (8.1 km east) and Egton (10.1 km east). 4 stations lie within 10 km in all. At 77.9%, Danby is less punctual than all of them; the best of the five, Egton, manages 85.3%.
Danby is one of 2 stations named after a Village called Danby, home to about 1,515 people; this one stands 0.2 km from its centre.
Across the whole run of data, the weakest four-week period for Danby was Period 1 of 2023-24, at 48.4%, some time before the latest year. The strongest was Period 11 of 2024-25, at 87.9%, and the two are 39.5 percentage points apart. Cancellations peaked at 5.7% of scheduled stops in Period 9 of 2023-24, against 1.3% over the latest 13 periods.
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 3,779 | 77.9% | 1.3% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 296 | – | 0.0% |
| Period 6 of 2026-27 | 296 | – | 0.7% |
| Period 5 of 2026-27 | 296 | – | 2.0% |
| Period 4 of 2026-27 | 296 | – | 0.0% |
| Period 3 of 2026-27 | 296 | – | 3.7% |
| Period 2 of 2026-27 | 296 | – | 2.7% |
| Period 1 of 2026-27 | 340 | – | 0.9% |
| Period 13 of 2025-26 | 326 | – | 1.2% |
| Period 12 of 2025-26 | 241 | – | 0.8% |
| Period 11 of 2025-26 | 296 | – | 0.0% |
| Period 10 of 2025-26 | 256 | 83.2% | 0.8% |
| Period 9 of 2025-26 | 272 | – | 2.6% |
| Period 8 of 2025-26 | 272 | 73.5% | 1.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out