Culham
CUMSouth EastManaged by Great Western Railway
How this station is performing
Culham had 15,776 scheduled stops to Period 7 of 2026-27, about 43 a day. 73.3% of recorded arrivals were within three minutes of the timetable and 4.6% of scheduled stops were cancelled.
Culham opened on 12 June 1844, 182 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Cholsey is the oldest (1840) and Radley the newest (1856), with Culham in between.
The nearest stations to Culham are Appleford (1.6 km south), Radley (3.5 km north), Didcot Parkway (4.7 km south), Cholsey (10.7 km south-east) and Oxford (11.3 km north). 3 stations lie within 10 km in all. Of the five, Cholsey is the most punctual at 78.9% and Didcot Parkway the least at 70.8%, with Culham on 73.3%.
Culham is one of 2 stations named after a Village called Culham, home to about 467 people; this one stands 2.0 km from its centre.
Across the whole run of data, the weakest four-week period for Culham was Period 9 of 2024-25, at 66.0%, some time before the latest year. The strongest was Period 1 of 2024-25, at 85.9%, and the two are 19.9 percentage points apart. Cancellations peaked at 45.5% of scheduled stops in Period 2 of 2023-24, against 4.6% over the latest 13 periods.
2 of 3 stations of a similar size in South East are more punctual than Culham on 73.3%. The comparison group includes Bosham (71.6%), Edenbridge (Kent) (91.1%) and Godstone (86.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 15,776 | 73.3% | 4.6% |
Operators with their own page for this station are linked to it.
Late train at Culham? Delay Repay
These operators call at Culham and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,222 | 73.5% | 4.3% |
| Period 6 of 2026-27 | 1,222 | 69.0% | 3.5% |
| Period 5 of 2026-27 | 1,222 | 70.4% | 11.8% |
| Period 4 of 2026-27 | 1,222 | 66.0% | 6.0% |
| Period 3 of 2026-27 | 1,222 | 73.3% | 5.2% |
| Period 2 of 2026-27 | 1,222 | 70.6% | 3.7% |
| Period 1 of 2026-27 | 1,420 | 75.6% | 4.3% |
| Period 13 of 2025-26 | 1,330 | 81.4% | 3.1% |
| Period 12 of 2025-26 | 918 | 82.3% | 3.4% |
| Period 11 of 2025-26 | 1,224 | 80.2% | 3.9% |
| Period 10 of 2025-26 | 1,106 | 76.6% | 4.7% |
| Period 9 of 2025-26 | 1,224 | 66.3% | 1.5% |
| Period 8 of 2025-26 | 1,222 | 68.6% | 4.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Bosham | 15,781 | 71.6% | 6.0% |
| Edenbridge (Kent) | 15,763 | 91.1% | 1.4% |
| Godstone | 15,763 | 86.2% | 1.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out