Crossflatts
CFLYorkshire and The HumberManaged by Northern Trains
How this station is performing
Crossflatts had 43,759 scheduled stops to Period 7 of 2026-27, about 120 a day. 88.1% of recorded arrivals were within three minutes of the timetable and 1.3% of scheduled stops were cancelled.
Crossflatts opened on 17 May 1982, 44 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Crossflatts is the newest; the oldest, Shipley (Yorks), opened in 1846.
The nearest stations to Crossflatts are Bingley (1.2 km south-east), Keighley (3.9 km west), Saltaire (4.1 km south-east), Shipley (Yorks) (5.4 km south-east) and Baildon (6.0 km east). 15 stations lie within 10 km in all. Of the five, Baildon is the most punctual at 90.2% and Bingley the least at 85.4%, with Crossflatts on 88.1%.
Crossflatts takes its name from a Village called Crossflatts, and the station stands 0.3 km from its centre.
Across the whole run of data, the weakest four-week period for Crossflatts was Period 9 of 2023-24, at 69.7%, some time before the latest year. The strongest was Period 1 of 2025-26, at 91.9%, and the two are 22.2 percentage points apart. Cancellations peaked at 8.8% of scheduled stops in Period 10 of 2023-24, against 1.3% over the latest 13 periods.
Compared with 3 stations of a similar size in Yorkshire and The Humber, Crossflatts is the least punctual, at 88.1%. All of them are ahead, including Saltaire (88.3%), Cononley (88.3%) and Steeton and Silsden (89.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 43,759 | 88.1% | 1.3% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,336 | 91.4% | 0.9% |
| Period 6 of 2026-27 | 3,336 | 90.3% | 0.9% |
| Period 5 of 2026-27 | 3,328 | 91.7% | 1.1% |
| Period 4 of 2026-27 | 3,322 | 91.6% | 1.7% |
| Period 3 of 2026-27 | 3,318 | 90.4% | 2.6% |
| Period 2 of 2026-27 | 3,336 | 91.0% | 1.3% |
| Period 1 of 2026-27 | 3,782 | 88.8% | 1.2% |
| Period 13 of 2025-26 | 3,654 | 90.5% | 0.3% |
| Period 12 of 2025-26 | 3,336 | 90.1% | 1.0% |
| Period 11 of 2025-26 | 3,336 | 88.0% | 1.5% |
| Period 10 of 2025-26 | 3,015 | 82.6% | 1.8% |
| Period 9 of 2025-26 | 3,324 | 78.0% | 1.4% |
| Period 8 of 2025-26 | 3,336 | 80.1% | 1.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Yorkshire and The Humber
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Saltaire | 43,759 | 88.3% | 1.3% |
| Cononley | 43,789 | 88.3% | 1.3% |
| Steeton and Silsden | 44,690 | 89.5% | 1.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out