Cross Gates
CRGYorkshire and The HumberManaged by Northern Trains
How this station is performing
Cross Gates had 24,469 scheduled stops to Period 7 of 2026-27, about 67 a day. 70.4% of recorded arrivals were within three minutes of the timetable and 2.4% of scheduled stops were cancelled.
Cross Gates opened on 22 September 1834, 192 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Cross Gates is the oldest; the next oldest, Garforth, dates from 1834.
The nearest stations to Cross Gates are Garforth (4.6 km east), East Garforth (5.4 km east), Woodlesford (5.4 km south), Leeds (6.6 km west) and Micklefield (8.4 km east). 8 stations lie within 10 km in all. Of the five, Woodlesford is the most punctual at 85.4% and Micklefield the least at 66.2%, with Cross Gates on 70.4%.
Cross Gates takes its name from a suburb called Cross Gates, home to about 7,770 people, and the station stands 0.1 km from its centre.
2 operators call at Cross Gates: Northern (70.3%, 98% of stops) and TransPennine Express (84.2%, 2% of stops). The operator you travel with matters: TransPennine Express reaches 84.2% within three minutes while Northern manages 70.3%, a gap of 13.9 percentage points.
2 of 3 stations of a similar size in Yorkshire and The Humber are more punctual than Cross Gates on 70.4%. The comparison group includes Gilberdyke (75.9%), Micklefield (66.2%) and Normanton (78.3%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 23,871 | 70.3% | 2.5% |
| TransPennine Express | 598 | 84.2% | 0.4% |
Operators with their own page for this station are linked to it.
Late train at Cross Gates? Delay Repay
These operators call at Cross Gates and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,970 | 66.6% | 1.9% |
| Period 6 of 2026-27 | 1,882 | 70.9% | 2.4% |
| Period 5 of 2026-27 | 1,692 | 70.5% | 3.1% |
| Period 4 of 2026-27 | 2,056 | 71.8% | 4.1% |
| Period 3 of 2026-27 | 1,631 | 72.8% | 1.7% |
| Period 2 of 2026-27 | 2,060 | 70.1% | 2.2% |
| Period 1 of 2026-27 | 2,224 | 78.2% | 1.7% |
| Period 13 of 2025-26 | 2,066 | 78.0% | 2.9% |
| Period 12 of 2025-26 | 1,693 | 73.6% | 1.3% |
| Period 11 of 2025-26 | 1,950 | 81.5% | 2.1% |
| Period 10 of 2025-26 | 1,672 | 69.4% | 2.6% |
| Period 9 of 2025-26 | 1,800 | 47.3% | 3.6% |
| Period 8 of 2025-26 | 1,773 | 60.7% | 2.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Yorkshire and The Humber
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Gilberdyke | 24,507 | 75.9% | 2.6% |
| Micklefield | 24,634 | 66.2% | 2.4% |
| Normanton | 24,273 | 78.3% | 2.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out