Transport for Wales at Crewe
All trains at CreweTransport for Wales across BritainNorth West
How this operator is doing here
Transport for Wales had 36,132 scheduled stops at Crewe in the 13 periods to Period 7 of 2026-27, 22% of the station's total. 77.5% of recorded arrivals came within three minutes and 1.8% of stops were cancelled.
Transport for Wales trains at Crewe also serve Nantwich (6.4 km south-west, 69.3% on time, 2.4% cancelled), Sandbach (7.3 km north, – on time, – cancelled), Wrenbury (13.4 km south-west, 76.8% on time, 1.9% cancelled), Whitchurch (Shropshire) (20.9 km south-west, 70.8% on time, 2.3% cancelled), Prees (27.2 km south-west, – on time, 1.9% cancelled) and Alderley Edge (27.2 km north-east, 76.2% on time, 2.5% cancelled), which are the stations on its network closest to Crewe.
Within 30 km of here, Transport for Wales runs best at Wrenbury, 13.4 km south-west (76.8%), and worst at Wilmslow, 29.8 km north-east (68.6%).
The busiest Transport for Wales station within 30 km of Crewe is Nantwich, 6.4 km south-west, with about 42 scheduled stops a day.
Transport for Wales ranks 2nd of the 7 operators with enough records at Crewe, on 77.5%.
Over three full railway years Transport for Wales at Crewe has improved each time, from 72.1% within three minutes in 2023-24 to 75.3% in 2024-25 and 79.8% in 2025-26.
Period by period
See how Transport for Wales Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,785 | 74.6% | 1.3% |
| Period 6 of 2026-27 | 2,772 | 71.3% | 2.4% |
| Period 5 of 2026-27 | 2,697 | 69.8% | 2.4% |
| Period 4 of 2026-27 | 2,792 | 71.7% | 3.6% |
| Period 3 of 2026-27 | 2,699 | 76.7% | 1.4% |
| Period 2 of 2026-27 | 2,777 | 79.8% | 2.0% |
| Period 1 of 2026-27 | 3,141 | 84.8% | 1.2% |
| Period 13 of 2025-26 | 3,028 | 83.4% | 1.0% |
| Period 12 of 2025-26 | 2,742 | 83.2% | 0.5% |
| Period 11 of 2025-26 | 2,761 | 79.9% | 2.8% |
| Period 10 of 2025-26 | 2,530 | 81.3% | 1.9% |
| Period 9 of 2025-26 | 2,664 | 70.7% | 2.6% |
| Period 8 of 2025-26 | 2,744 | 78.2% | 1.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Crewe
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Avanti | 47,425 | 55.1% | 4.7% |
| West Midlands Railway | 46,638 | 65.3% | 3.9% |
| Northern | 21,225 | 80.2% | 2.3% |
| East Midlands Railway | 10,792 | 76.5% | 3.3% |
| CrossCountry | 786 | 64.1% | 4.1% |
| Lumo (West Coast) | 698 | 50.0% | 3.8% |
| Caledonian Sleeper | 544 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out