Northern at Crewe
How this operator is doing here
Northern had 21,225 scheduled stops at Crewe in the 13 periods to Period 7 of 2026-27, 13% of the station's total. 80.2% of recorded arrivals came within three minutes and 2.3% of stops were cancelled.
Northern trains at Crewe also serve Sandbach (7.3 km north, 82.0% on time, 2.2% cancelled), Kidsgrove (12.5 km east, 75.8% on time, 2.6% cancelled), Holmes Chapel (13.4 km north-east, 79.6% on time, 2.0% cancelled), Longport (15.3 km east, 92.6% on time, 3.3% cancelled), Goostrey (16.5 km north-east, 82.5% on time, 2.1% cancelled) and Congleton (17.7 km north-east, 78.1% on time, 2.5% cancelled), which are the stations on its network closest to Crewe.
Within 30 km of here, Northern runs best at Delamere, 22.0 km north-west (87.0%), and worst at Kidsgrove, 12.5 km east (75.8%).
The busiest Northern station within 30 km of Crewe is Wilmslow, 29.8 km north-east, with about 90 scheduled stops a day.
Of the 7 operators with enough records at Crewe, Northern is the most punctual, at 80.2%.
For Northern, Crewe is the 236th best of 493 ranked stations. Its 80.2% here is 1.6 percentage points above the 78.6% across the whole network.
Over three full railway years Northern at Crewe has got worse each time, from 84.7% within three minutes in 2023-24 to 82.7% in 2024-25 and 79.4% in 2025-26.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,608 | 79.8% | 2.0% |
| Period 6 of 2026-27 | 1,608 | 80.8% | 1.1% |
| Period 5 of 2026-27 | 1,624 | 79.7% | 1.2% |
| Period 4 of 2026-27 | 1,608 | 77.7% | 2.0% |
| Period 3 of 2026-27 | 1,608 | 79.2% | 1.5% |
| Period 2 of 2026-27 | 1,624 | 81.2% | 2.6% |
| Period 1 of 2026-27 | 1,858 | 85.9% | 4.0% |
| Period 13 of 2025-26 | 1,754 | 84.5% | 1.1% |
| Period 12 of 2025-26 | 1,606 | 84.4% | 2.8% |
| Period 11 of 2025-26 | 1,624 | 82.5% | 4.2% |
| Period 10 of 2025-26 | 1,472 | 81.1% | 3.9% |
| Period 9 of 2025-26 | 1,607 | 70.6% | 2.8% |
| Period 8 of 2025-26 | 1,624 | 73.6% | 1.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Crewe
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Avanti | 47,425 | 55.1% | 4.7% |
| West Midlands Railway | 46,638 | 65.3% | 3.9% |
| Transport for Wales | 36,132 | 77.5% | 1.8% |
| East Midlands Railway | 10,792 | 76.5% | 3.3% |
| CrossCountry | 786 | 64.1% | 4.1% |
| Lumo (West Coast) | 698 | 50.0% | 3.8% |
| Caledonian Sleeper | 544 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out