Northern at Cramlington
How this operator is doing here
Northern had 12,346 scheduled stops at Cramlington in the 13 periods to Period 7 of 2026-27, 98% of the station's total. 83.9% of recorded arrivals came within three minutes and 2.3% of stops were cancelled.
Northern trains at Cramlington also serve Seaton Delaval (4.1 km east, 80.9% on time, 2.1% cancelled), Newsham (5.0 km east, 82.6% on time, 2.2% cancelled), Morpeth (9.9 km north-west, 83.3% on time, 2.3% cancelled), Pegswood (10.5 km north, 66.4% on time, 0.2% cancelled), Ashington (10.6 km north, 82.1% on time, 2.6% cancelled) and Manors (12.8 km south, 85.5% on time, 2.2% cancelled), which are the stations on its network closest to Cramlington.
Within 30 km of here, Northern runs best at Dunston, 15.6 km south (87.0%), and worst at Sunderland, 24.5 km south-east (77.1%).
The busiest Northern station within 30 km of Cramlington is Newcastle, 13.3 km south, with about 208 scheduled stops a day.
Of the 1 operators with enough records at Cramlington, Northern is the most punctual, at 83.9%.
For Northern, Cramlington is the 147th best of 493 ranked stations. Its 83.9% here is 5.3 percentage points above the 78.6% across the whole network.
Northern at Cramlington has slipped a little, from 86.0% within three minutes in the previous 13 periods to 83.9% in the latest 13, a fall of 2.1 percentage points. Cancellations fell to 2.3% of scheduled stops from 3.1%, which is 0.8 percentage points fewer.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 820 | 83.9% | 1.5% |
| Period 6 of 2026-27 | 940 | 84.4% | 2.2% |
| Period 5 of 2026-27 | 976 | 81.3% | 2.8% |
| Period 4 of 2026-27 | 976 | 83.2% | 3.3% |
| Period 3 of 2026-27 | 976 | 84.3% | 1.7% |
| Period 2 of 2026-27 | 976 | 87.0% | 3.5% |
| Period 1 of 2026-27 | 1,120 | 83.8% | 0.7% |
| Period 13 of 2025-26 | 1,076 | 86.8% | 2.1% |
| Period 12 of 2025-26 | 976 | 87.7% | 1.2% |
| Period 11 of 2025-26 | 972 | 85.9% | 3.0% |
| Period 10 of 2025-26 | 826 | 80.4% | 5.9% |
| Period 9 of 2025-26 | 856 | 79.1% | 1.2% |
| Period 8 of 2025-26 | 856 | 81.7% | 1.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Cramlington
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| TransPennine Express | 307 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out