West Midlands Railway at Cradley Heath
All trains at Cradley HeathWest Midlands Railway across BritainWest Midlands
How this operator is doing here
West Midlands Railway had 41,221 scheduled stops at Cradley Heath in the 13 periods to Period 7 of 2026-27, 99% of the station's total. 88.2% of recorded arrivals came within three minutes and 3.6% of stops were cancelled.
West Midlands Railway trains at Cradley Heath also serve Lye (West Midlands) (2.0 km south-west, 88.3% on time, 3.6% cancelled), Old Hill (2.4 km east, 88.9% on time, 3.7% cancelled), Stourbridge Town (3.8 km south-west, 100.0% on time, 1.1% cancelled), Stourbridge Junction (3.8 km south-west, 95.3% on time, 2.0% cancelled), Rowley Regis (4.1 km east, 88.2% on time, 3.5% cancelled) and Langley Green (6.4 km north-east, 89.0% on time, 3.6% cancelled), which are the stations on its network closest to Cradley Heath.
Within 30 km of here, West Midlands Railway runs best at Stourbridge Town, 3.8 km south-west (100.0%), and worst at Penkridge, 28.3 km north (57.1%).
The busiest West Midlands Railway station within 30 km of Cradley Heath is Birmingham New Street, 13.0 km east, with about 532 scheduled stops a day.
Of the 1 operators with enough records at Cradley Heath, West Midlands Railway is the most punctual, at 88.2%.
For West Midlands Railway, Cradley Heath is the 49th best of 169 ranked stations. Its 88.2% here is 7.1 percentage points above the 81.1% across the whole network.
Period by period
See how West Midlands Railway Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,256 | 86.1% | 2.0% |
| Period 6 of 2026-27 | 3,256 | 85.8% | 2.1% |
| Period 5 of 2026-27 | 2,399 | 85.7% | 8.0% |
| Period 4 of 2026-27 | 3,000 | 85.3% | 4.7% |
| Period 3 of 2026-27 | 3,142 | 88.4% | 2.8% |
| Period 2 of 2026-27 | 3,002 | 87.8% | 4.1% |
| Period 1 of 2026-27 | 3,768 | 91.3% | 3.3% |
| Period 13 of 2025-26 | 3,558 | 91.2% | 3.1% |
| Period 12 of 2025-26 | 3,256 | 92.3% | 2.1% |
| Period 11 of 2025-26 | 3,171 | 92.3% | 3.4% |
| Period 10 of 2025-26 | 2,904 | 88.1% | 3.7% |
| Period 9 of 2025-26 | 3,255 | 84.1% | 4.3% |
| Period 8 of 2025-26 | 3,254 | 86.7% | 4.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Cradley Heath
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Chiltern Railways | 290 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out