GTR had 22,563 scheduled stops at Cosham in the 13 periods to Period 7 of 2026-27, 38% of the station's total. 75.5% of recorded arrivals came within three minutes and 5.7% of stops were cancelled.
GTR trains at Cosham also serve Hilsea (1.7 km south, 78.6% on time, 7.1% cancelled), Portchester (4.1 km west, 79.2% on time, 5.7% cancelled), Fratton (5.1 km south, 73.2% on time, 9.6% cancelled), Portsmouth and Southsea (5.1 km south, 73.7% on time, 13.4% cancelled), Bedhampton (5.2 km east, 75.1% on time, 5.0% cancelled) and Portsmouth Harbour (5.8 km south-west, 77.2% on time, 15.5% cancelled), which are the stations on its network closest to Cosham.
Within 30 km of here, GTR runs best at Bognor Regis, 28.2 km east (89.2%), and worst at Bosham, 15.5 km east (71.6%).
The busiest GTR station within 30 km of Cosham is Chichester, 20.1 km east, with about 193 scheduled stops a day.
Of the 3 operators with enough records at Cosham, GTR is the most punctual, at 75.5%.
GTR at Cosham has slipped sharply. 75.5% of stops came within three minutes of the timetable in the latest 13 periods, 7.6 percentage points worse than the 83.1% recorded in the 13 before. Cancellations held steady at 5.7% of scheduled stops, against 5.7% before.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,748 | 63.8% | 5.5% |
| Period 6 of 2026-27 | 1,628 | 66.1% | 4.5% |
| Period 5 of 2026-27 | 1,776 | 69.2% | 2.1% |
| Period 4 of 2026-27 | 1,744 | 76.2% | 3.2% |
| Period 3 of 2026-27 | 1,639 | 77.0% | 7.3% |
| Period 2 of 2026-27 | 1,745 | 74.0% | 9.1% |
| Period 1 of 2026-27 | 1,990 | 77.0% | 5.1% |
| Period 13 of 2025-26 | 1,918 | 78.7% | 4.0% |
| Period 12 of 2025-26 | 1,576 | 80.3% | 5.8% |
| Period 11 of 2025-26 | 1,779 | 83.9% | 7.5% |
| Period 10 of 2025-26 | 1,520 | 81.9% | 8.6% |
| Period 9 of 2025-26 | 1,750 | 75.3% | 4.4% |
| Period 8 of 2025-26 | 1,750 | 79.5% | 8.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Cosham
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 28,311 | 71.0% | 3.1% |
| Great Western Railway | 8,119 | 63.9% | 4.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out