Christchurch
CHRSouth WestManaged by South Western Railway
How this station is performing
Christchurch had 24,193 scheduled stops to Period 7 of 2026-27, about 66 a day. 71.0% of recorded arrivals were within three minutes of the timetable and 5.9% of scheduled stops were cancelled.
Christchurch opened on 13 November 1862, 164 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Christchurch is the oldest; the next oldest, Bournemouth, dates from 1870.
The nearest stations to Christchurch are Pokesdown (3.1 km west), Hinton Admiral (5.2 km east), Bournemouth (5.7 km west), New Milton (9.1 km east) and Branksome (9.6 km west). 5 stations lie within 10 km in all. Of the five, Branksome is the most punctual at 74.5% and Bournemouth the least at 69.7%, with Christchurch on 71.0%.
Christchurch is one of 4 stations named after a town called Christchurch, home to about 54,210 people; this one stands 1.0 km from its centre.
Christchurch has slipped sharply. 71.0% of stops came within three minutes of the timetable in the latest 13 periods, 6.4 percentage points worse than the 77.4% recorded in the 13 before. Cancellations rose to 5.9% of scheduled stops from 3.9%, which is 2.0 percentage points more.
2 of 3 stations of a similar size in South West are more punctual than Christchurch on 71.0%. The comparison group includes Pokesdown (70.6%), Lympstone Village (85.2%) and Newcourt (81.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 24,193 | 71.0% | 5.9% |
Operators with their own page for this station are linked to it.
Late train at Christchurch? Delay Repay
These operators call at Christchurch and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,782 | 59.5% | 5.0% |
| Period 6 of 2026-27 | 1,876 | 72.1% | 3.0% |
| Period 5 of 2026-27 | 1,883 | 57.4% | 5.7% |
| Period 4 of 2026-27 | 1,887 | 60.2% | 6.4% |
| Period 3 of 2026-27 | 1,739 | 71.7% | 7.7% |
| Period 2 of 2026-27 | 1,891 | 69.4% | 8.9% |
| Period 1 of 2026-27 | 2,124 | 83.8% | 2.9% |
| Period 13 of 2025-26 | 2,088 | 81.5% | 6.1% |
| Period 12 of 2025-26 | 1,755 | 80.2% | 6.8% |
| Period 11 of 2025-26 | 1,881 | 80.4% | 7.3% |
| Period 10 of 2025-26 | 1,646 | 76.1% | 4.3% |
| Period 9 of 2025-26 | 1,897 | 64.6% | 6.5% |
| Period 8 of 2025-26 | 1,744 | 63.7% | 6.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Pokesdown | 23,697 | 70.6% | 5.9% |
| Lympstone Village | 24,716 | 85.2% | 3.3% |
| Newcourt | 24,718 | 81.5% | 3.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out