GTR at Charlton
How this operator is doing here
GTR had 21,759 scheduled stops at Charlton in the 13 periods to Period 7 of 2026-27, 28% of the station's total. 84.1% of recorded arrivals came within three minutes and 6.5% of stops were cancelled.
GTR trains at Charlton also serve Westcombe Park (0.9 km west, 82.7% on time, 6.7% cancelled), Maze Hill (2.0 km west, 82.5% on time, 6.7% cancelled), Woolwich Arsenal (2.7 km east, 82.9% on time, 6.5% cancelled), Blackheath (2.8 km south-west, 91.6% on time, 1.3% cancelled), Greenwich (3.3 km west, 81.9% on time, 6.7% cancelled) and Plumstead (3.7 km east, 85.5% on time, 6.3% cancelled), which are the stations on its network closest to Charlton.
Within 30 km of here, GTR runs best at Beckenham Junction, 9.3 km south-west (98.1%), and worst at Kenley, 20.2 km south-west (66.9%).
The busiest GTR station within 30 km of Charlton is East Croydon, 15.1 km south-west, with about 813 scheduled stops a day.
Of the 2 operators with enough records at Charlton, GTR is the least punctual, at 84.1%.
For GTR, Charlton is the 147th best of 307 ranked stations. Its 84.1% here is 1.2 percentage points above the 82.9% across the whole network.
Cancellations of GTR at Charlton are near its usual level: 6.5% of scheduled stops, against 4.7% across its network and 2.9% for every operator at the station.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,865 | 83.7% | 5.7% |
| Period 6 of 2026-27 | 1,655 | 81.7% | 5.0% |
| Period 5 of 2026-27 | 1,232 | 83.4% | 7.6% |
| Period 4 of 2026-27 | 1,616 | 81.4% | 4.3% |
| Period 3 of 2026-27 | 1,119 | 81.6% | 6.3% |
| Period 2 of 2026-27 | 1,594 | 84.2% | 4.1% |
| Period 1 of 2026-27 | 1,944 | 88.1% | 4.8% |
| Period 13 of 2025-26 | 1,998 | 86.6% | 2.7% |
| Period 12 of 2025-26 | 1,737 | 83.5% | 7.9% |
| Period 11 of 2025-26 | 1,797 | 85.4% | 8.4% |
| Period 10 of 2025-26 | 1,599 | 87.2% | 9.8% |
| Period 9 of 2025-26 | 1,837 | 82.7% | 10.6% |
| Period 8 of 2025-26 | 1,766 | 81.6% | 7.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Charlton
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 56,581 | 88.3% | 1.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out