Chandlers Ford
CFRSouth EastManaged by South Western Railway
How this station is performing
Chandlers Ford had 12,468 scheduled stops to Period 7 of 2026-27, about 34 a day. 76.1% of recorded arrivals were within three minutes of the timetable and 3.3% of scheduled stops were cancelled.
Chandlers Ford opened on 18 May 2003, 23 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Chandlers Ford is the newest; the oldest, Eastleigh, opened in 1839.
The nearest stations to Chandlers Ford are Eastleigh (2.9 km south-east), Southampton Airport Parkway (3.9 km south), Swaythling (4.7 km south), Shawford (5.9 km north-east) and St Denys (6.8 km south). 13 stations lie within 10 km in all. Of the five, Shawford is the most punctual at 78.9% and Southampton Airport Parkway the least at 67.0%, with Chandlers Ford on 76.1%.
Chandlers Ford is named after Chandler's Ford, a Village, home to about 23,918 people, but the station stands 0.4 km from its centre.
2 operators call at Chandlers Ford: South Western Railway (76.2%, 99% of stops) and Great Western Railway (58.5%, 1% of stops). The operator you travel with matters: South Western Railway reaches 76.2% within three minutes while Great Western Railway manages 58.5%, a gap of 17.7 percentage points.
Compared with 3 stations of a similar size in South East, Chandlers Ford is the least punctual, at 76.1%. All of them are ahead, including Rye (Sussex) (86.6%), Appledore (Kent) (85.4%) and Ham Street (85.7%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 12,294 | 76.2% | 3.3% |
| Great Western Railway | 174 | 58.5% | 1.4% |
Operators with their own page for this station are linked to it.
Late train at Chandlers Ford? Delay Repay
These operators call at Chandlers Ford and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 888 | 73.6% | 1.4% |
| Period 6 of 2026-27 | 979 | 76.1% | 2.0% |
| Period 5 of 2026-27 | 981 | 63.7% | 1.8% |
| Period 4 of 2026-27 | 981 | 63.8% | 5.3% |
| Period 3 of 2026-27 | 980 | 79.9% | 4.6% |
| Period 2 of 2026-27 | 954 | 78.2% | 4.6% |
| Period 1 of 2026-27 | 985 | 81.3% | 2.2% |
| Period 13 of 2025-26 | 1,021 | 84.8% | 2.2% |
| Period 12 of 2025-26 | 878 | 77.3% | 0.6% |
| Period 11 of 2025-26 | 984 | 85.4% | 5.7% |
| Period 10 of 2025-26 | 872 | 83.9% | 4.4% |
| Period 9 of 2025-26 | 984 | 69.8% | 2.6% |
| Period 8 of 2025-26 | 981 | 72.1% | 4.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Rye (Sussex) | 12,527 | 86.6% | 4.3% |
| Appledore (Kent) | 12,536 | 85.4% | 4.9% |
| Ham Street | 12,536 | 85.7% | 4.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out