Chalkwell
CHWEast of EnglandManaged by c2c
How this station is performing
Chalkwell had 73,171 scheduled stops to Period 7 of 2026-27, about 201 a day. 89.0% of recorded arrivals were within three minutes of the timetable and 1.8% of scheduled stops were cancelled.
Chalkwell opened on 11 September 1933, 93 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Chalkwell is the newest; the oldest, Leigh-on-Sea, opened in 1855.
The nearest stations to Chalkwell are Westcliff (1.5 km east), Leigh-on-Sea (2.1 km west), Southend Central (2.9 km east), Southend Victoria (2.9 km east) and Prittlewell (3.1 km north-east). 13 stations lie within 10 km in all. Of the five, Southend Victoria is the most punctual at 92.1% and Southend Central the least at 87.2%, with Chalkwell on 89.0%.
Chalkwell takes its name from a suburb called Chalkwell, home to about 9,930 people, and the station stands 0.6 km from its centre.
For Chalkwell, the weakest four-week period in the data is a recent one: Period 6 of 2026-27, when only 71.3% of stops arrived within three minutes of the timetable. The strongest was Period 1 of 2023-24, at 96.2%, which is 24.9 percentage points higher.
Compared with 3 stations of a similar size in East of England, Chalkwell is the most punctual, at 89.0%. The comparison group includes Westcliff (87.3%), Southend Central (87.2%) and Stansted Airport (87.4%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| c2c | 73,171 | 89.0% | 1.8% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 5,443 | 86.5% | 2.0% |
| Period 6 of 2026-27 | 4,153 | 71.3% | 3.2% |
| Period 5 of 2026-27 | 5,036 | 78.9% | 2.6% |
| Period 4 of 2026-27 | 6,025 | 89.7% | 3.8% |
| Period 3 of 2026-27 | 4,984 | 90.1% | 2.2% |
| Period 2 of 2026-27 | 5,979 | 92.2% | 2.9% |
| Period 1 of 2026-27 | 6,960 | 91.0% | 1.5% |
| Period 13 of 2025-26 | 6,637 | 94.0% | 0.8% |
| Period 12 of 2025-26 | 5,642 | 92.9% | 1.4% |
| Period 11 of 2025-26 | 5,783 | 92.3% | 0.6% |
| Period 10 of 2025-26 | 5,143 | 87.0% | 1.1% |
| Period 9 of 2025-26 | 5,491 | 92.8% | 0.7% |
| Period 8 of 2025-26 | 5,895 | 90.1% | 1.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in East of England
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Westcliff | 73,131 | 87.3% | 1.8% |
| Southend Central | 73,602 | 87.2% | 1.7% |
| Stansted Airport | 74,207 | 87.4% | 3.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out