How this operator is doing here
Elizabeth line had 118,885 scheduled stops at Chadwell Heath in the 13 periods to Period 7 of 2026-27, 100% of the station's total. 88.3% of recorded arrivals came within three minutes and 2.5% of stops were cancelled.
Elizabeth line trains at Chadwell Heath also serve Goodmayes (1.1 km west, 88.6% on time, 2.5% cancelled), Seven Kings (2.3 km west, 88.3% on time, 2.5% cancelled), Romford (3.8 km east, 88.8% on time, 2.3% cancelled), Ilford (4.2 km west, 90.1% on time, 2.2% cancelled), Gidea Park (5.5 km east, 87.9% on time, 2.7% cancelled) and Manor Park (6.0 km west, 89.5% on time, 2.5% cancelled), which are the stations on its network closest to Chadwell Heath.
Within 30 km of here, Elizabeth line runs best at Abbey Wood, 8.6 km south (94.9%), and worst at Acton Main Line, 28.0 km west (83.5%).
The busiest Elizabeth line station within 30 km of Chadwell Heath is London Paddington, 21.9 km west, with about 644 scheduled stops a day.
Of the 1 operators with enough records at Chadwell Heath, Elizabeth line is the most punctual, at 88.3%.
For Elizabeth line, Chadwell Heath is the 21st best of 41 ranked stations. Its 88.3% here is 1.3 percentage points below the 89.6% across the whole network.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 9,282 | 89.9% | 2.0% |
| Period 6 of 2026-27 | 9,199 | 85.4% | 3.1% |
| Period 5 of 2026-27 | 9,284 | 84.5% | 5.2% |
| Period 4 of 2026-27 | 9,122 | 85.5% | 3.1% |
| Period 3 of 2026-27 | 9,226 | 85.1% | 3.4% |
| Period 2 of 2026-27 | 9,124 | 89.5% | 2.3% |
| Period 1 of 2026-27 | 10,549 | 90.2% | 2.0% |
| Period 13 of 2025-26 | 8,266 | 87.6% | 3.1% |
| Period 12 of 2025-26 | 9,282 | 92.4% | 0.9% |
| Period 11 of 2025-26 | 9,285 | 90.3% | 1.6% |
| Period 10 of 2025-26 | 8,230 | 92.0% | 1.7% |
| Period 9 of 2025-26 | 8,896 | 88.3% | 2.1% |
| Period 8 of 2025-26 | 9,140 | 87.2% | 2.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Chadwell Heath
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Greater Anglia | 1 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out