Canterbury West
CBWSouth EastManaged by Southeastern
How this station is performing
Canterbury West had 30,453 scheduled stops to Period 7 of 2026-27, about 84 a day. 77.8% of recorded arrivals were within three minutes of the timetable and 0.9% of scheduled stops were cancelled.
Canterbury West opened on 6 February 1846, 180 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Canterbury West is the oldest; the next oldest, Chilham, dates from 1846.
The nearest stations to Canterbury West are Canterbury East (1.1 km south), Sturry (3.8 km north-east), Chartham (5.0 km south-west), Bekesbourne (5.0 km south-east) and Chilham (8.2 km south-west). 10 stations lie within 10 km in all. Of the five, Chartham is the most punctual at 80.9% and Canterbury East the least at 71.1%, with Canterbury West on 77.8%.
Canterbury West is named after Canterbury, a city of United Kingdom, home to about 54,880 people, but the station stands 0.7 km from its centre.
Canterbury West has slipped a little, from 82.6% within three minutes in the previous 13 periods to 77.8% in the latest 13, a fall of 4.8 percentage points. Cancellations held steady at 0.9% of scheduled stops, against 1.3% before.
2 of 3 stations of a similar size in South East are more punctual than Canterbury West on 77.8%. The comparison group includes West Malling (74.8%), Folkestone Central (82.0%) and Folkestone West (82.1%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 30,453 | 77.8% | 0.9% |
Operators with their own page for this station are linked to it.
Late train at Canterbury West? Delay Repay
These operators call at Canterbury West and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,373 | 64.6% | 0.7% |
| Period 6 of 2026-27 | 2,359 | 52.0% | 1.1% |
| Period 5 of 2026-27 | 2,373 | 66.8% | 0.5% |
| Period 4 of 2026-27 | 2,372 | 83.6% | 1.1% |
| Period 3 of 2026-27 | 2,282 | 80.8% | 1.5% |
| Period 2 of 2026-27 | 2,327 | 79.9% | 1.7% |
| Period 1 of 2026-27 | 2,673 | 88.2% | 0.5% |
| Period 13 of 2025-26 | 2,502 | 86.2% | 0.7% |
| Period 12 of 2025-26 | 2,295 | 86.0% | 0.4% |
| Period 11 of 2025-26 | 2,324 | 84.9% | 0.9% |
| Period 10 of 2025-26 | 2,020 | 80.0% | 0.8% |
| Period 9 of 2025-26 | 2,229 | 77.3% | 0.8% |
| Period 8 of 2025-26 | 2,324 | 80.5% | 1.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| West Malling | 30,716 | 74.8% | 1.5% |
| Folkestone Central | 29,963 | 82.0% | 1.1% |
| Folkestone West | 29,961 | 82.1% | 1.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out