London Overground at Camden Road
All trains at Camden RoadLondon Overground across BritainLondon
How this operator is doing here
London Overground had 106,119 scheduled stops at Camden Road in the 13 periods to Period 7 of 2026-27, 100% of the station's total. 79.9% of recorded arrivals came within three minutes and 8.4% of stops were cancelled.
London Overground trains at Camden Road also serve Kentish Town West (0.7 km north-west, 79.1% on time, 8.2% cancelled), London Euston (1.5 km south, 95.6% on time, 2.8% cancelled), Caledonian Road and Barnsbury (1.7 km east, 79.3% on time, 9.0% cancelled), Gospel Oak (1.7 km north-west, 85.8% on time, 6.5% cancelled), Hampstead Heath (2.3 km north-west, 77.5% on time, 8.2% cancelled) and Upper Holloway (2.5 km north, 94.7% on time, 3.2% cancelled), which are the stations on its network closest to Camden Road.
Within 30 km of here, London Overground runs best at Romford, 22.6 km east (99.7%), and worst at Finchley Road and Frognal, 3.2 km west (75.2%).
The busiest London Overground station within 30 km of Camden Road is Highbury and Islington, 2.5 km east, with about 593 scheduled stops a day.
Of the 1 operators with enough records at Camden Road, London Overground is the most punctual, at 79.9%.
Over three full railway years London Overground at Camden Road has got worse each time, from 85.6% within three minutes in 2023-24 to 81.0% in 2024-25 and 79.0% in 2025-26.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 8,344 | 84.3% | 5.9% |
| Period 6 of 2026-27 | 8,295 | 78.7% | 10.6% |
| Period 5 of 2026-27 | 8,273 | 82.4% | 17.2% |
| Period 4 of 2026-27 | 8,264 | 75.8% | 13.8% |
| Period 3 of 2026-27 | 7,166 | 77.8% | 8.2% |
| Period 2 of 2026-27 | 8,253 | 79.5% | 11.5% |
| Period 1 of 2026-27 | 9,487 | 84.9% | 4.0% |
| Period 13 of 2025-26 | 9,063 | 85.5% | 3.7% |
| Period 12 of 2025-26 | 7,923 | 83.0% | 5.7% |
| Period 11 of 2025-26 | 7,843 | 80.6% | 7.3% |
| Period 10 of 2025-26 | 7,017 | 79.0% | 7.2% |
| Period 9 of 2025-26 | 8,051 | 68.9% | 10.7% |
| Period 8 of 2025-26 | 8,140 | 75.4% | 4.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out