Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

West Midlands Railway at Bushey

All trains at BusheyWest Midlands Railway across BritainEast of England

On time, last 13 periods78.0%Whole station: 84.5%
Cancelled6.4%Whole station: 4.4%
Scheduled stops26,929Of 78,359 at the station

How this operator is doing here

West Midlands Railway had 26,929 scheduled stops at Bushey in the 13 periods to Period 7 of 2026-27, 34% of the station's total. 78.0% of recorded arrivals came within three minutes and 6.4% of stops were cancelled.

West Midlands Railway trains at Bushey also serve Watford Junction (2.2 km north, 79.1% on time, 5.9% cancelled), Watford North (3.3 km north, 95.6% on time, 6.3% cancelled), Garston (Hertfordshire) (4.6 km north, 96.3% on time, 6.2% cancelled), Harrow and Wealdstone (6.9 km south-east, 79.4% on time, 7.1% cancelled), Bricket Wood (6.9 km north, 95.4% on time, 6.2% cancelled) and Kings Langley (7.7 km north-west, 76.7% on time, 5.9% cancelled), which are the stations on its network closest to Bushey.

Within 30 km of here, West Midlands Railway runs best at Park Street, 9.4 km north (96.6%), and worst at London Euston, 21.6 km south-east (74.2%).

The busiest West Midlands Railway station within 30 km of Bushey is London Euston, 21.6 km south-east, with about 225 scheduled stops a day.

Of the 2 operators with enough records at Bushey, West Midlands Railway is the least punctual, at 78.0%.

West Midlands Railway at Bushey has slipped a little, from 80.7% within three minutes in the previous 13 periods to 78.0% in the latest 13, a fall of 2.7 percentage points. Cancellations rose to 6.4% of scheduled stops from 4.0%, which is 2.4 percentage points more.

Period by period

70%75%80%85%90%2023-242024-252025-262026-27Period 1 of 2023-24: 80.7%Period 2 of 2023-24: 83.1%Period 3 of 2023-24: 72.2%Period 4 of 2023-24: 80.0%Period 5 of 2023-24: 80.0%Period 6 of 2023-24: 79.2%Period 7 of 2023-24: 81.3%Period 8 of 2023-24: 80.1%Period 9 of 2023-24: 79.3%Period 10 of 2023-24: 80.3%Period 11 of 2023-24: 86.3%Period 12 of 2023-24: 82.1%Period 13 of 2023-24: 83.4%Period 1 of 2024-25: 81.6%Period 2 of 2024-25: 86.3%Period 3 of 2024-25: 78.3%Period 4 of 2024-25: 81.0%Period 5 of 2024-25: 80.0%Period 6 of 2024-25: 82.0%Period 7 of 2024-25: 82.8%Period 8 of 2024-25: 72.3%Period 9 of 2024-25: 72.3%Period 10 of 2024-25: 80.9%Period 11 of 2024-25: 84.4%Period 12 of 2024-25: 84.8%Period 13 of 2024-25: 84.2%Period 1 of 2025-26: 81.7%Period 2 of 2025-26: 81.1%Period 3 of 2025-26: 85.2%Period 4 of 2025-26: 76.0%Period 5 of 2025-26: 81.3%Period 6 of 2025-26: 81.4%Period 7 of 2025-26: 82.8%Period 8 of 2025-26: 76.6%Period 9 of 2025-26: 75.4%Period 10 of 2025-26: 79.9%Period 11 of 2025-26: 77.4%Period 12 of 2025-26: 80.0%Period 13 of 2025-26: 83.3%Period 1 of 2026-27: 78.8%Period 2 of 2026-27: 73.0%Period 3 of 2026-27: 80.9%Period 4 of 2026-27: 76.6%Period 5 of 2026-27: 77.5%Period 6 of 2026-27: 75.2%Period 7 of 2026-27: 78.3%
This pageGreat Britain
0%5%10%15%Period 1 of 2023-24: 3.0%Period 2 of 2023-24: 4.5%Period 3 of 2023-24: 6.0%Period 4 of 2023-24: 3.9%Period 5 of 2023-24: 12.7%Period 6 of 2023-24: 3.5%Period 7 of 2023-24: 3.1%Period 8 of 2023-24: 6.9%Period 9 of 2023-24: 5.3%Period 10 of 2023-24: 12.4%Period 11 of 2023-24: 3.1%Period 12 of 2023-24: 4.7%Period 13 of 2023-24: 3.8%Period 1 of 2024-25: 7.0%Period 2 of 2024-25: 3.4%Period 3 of 2024-25: 8.2%Period 4 of 2024-25: 7.3%Period 5 of 2024-25: 4.0%Period 6 of 2024-25: 6.9%Period 7 of 2024-25: 6.2%Period 8 of 2024-25: 4.5%Period 9 of 2024-25: 8.4%Period 10 of 2024-25: 5.4%Period 11 of 2024-25: 2.3%Period 12 of 2024-25: 3.2%Period 13 of 2024-25: 2.7%Period 1 of 2025-26: 3.4%Period 2 of 2025-26: 2.7%Period 3 of 2025-26: 2.7%Period 4 of 2025-26: 4.3%Period 5 of 2025-26: 4.9%Period 6 of 2025-26: 2.9%Period 7 of 2025-26: 4.9%Period 8 of 2025-26: 5.4%Period 9 of 2025-26: 4.9%Period 10 of 2025-26: 5.9%Period 11 of 2025-26: 6.2%Period 12 of 2025-26: 5.3%Period 13 of 2025-26: 3.7%Period 1 of 2026-27: 6.6%Period 2 of 2026-27: 12.6%Period 3 of 2026-27: 5.3%Period 4 of 2026-27: 5.9%Period 5 of 2026-27: 8.0%Period 6 of 2026-27: 8.1%Period 7 of 2026-27: 5.7%2023-242024-252025-262026-27

See how West Midlands Railway Delay Repay works

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-272,09178.3%5.7%
Period 6 of 2026-272,13275.2%8.1%
Period 5 of 2026-272,12177.5%8.0%
Period 4 of 2026-272,03676.6%5.9%
Period 3 of 2026-272,07680.9%5.3%
Period 2 of 2026-271,89173.0%12.6%
Period 1 of 2026-271,94278.8%6.6%
Period 13 of 2025-262,37583.3%3.7%
Period 12 of 2025-262,14480.0%5.3%
Period 11 of 2025-262,04777.4%6.2%
Period 10 of 2025-261,89479.9%5.9%
Period 9 of 2025-262,13475.4%4.9%
Period 8 of 2025-262,04676.6%5.4%

Time of year

70%75%80%85%90%P1: 80.7%1P2: 81.2%2P3: 79.3%3P4: 78.4%4P5: 79.7%5P6: 79.5%6P7: 81.3%7P8: 76.3%8P9: 75.7%9P10: 80.4%10P11: 82.8%11P12: 82.3%12P13: 83.6%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Other operators at Bushey

OperatorScheduled stopsWithin 3 minCancelled
London Overground51,43087.7%3.3%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out