Bromborough
BOMNorth WestManaged by Merseyrail
How this station is performing
Bromborough had 66,911 scheduled stops to Period 7 of 2026-27, about 184 a day. 88.3% of recorded arrivals were within three minutes of the timetable and 3.6% of scheduled stops were cancelled.
Bromborough opened on 30 May 1846, 180 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Hooton is the oldest (1840) and Eastham Rake the newest (1995), with Bromborough in between.
The nearest stations to Bromborough are Bromborough Rake (0.9 km north), Eastham Rake (1.7 km south), Spital (2.0 km north), Hooton (2.9 km south) and Port Sunlight (3.0 km north). 32 stations lie within 10 km in all. Of the five, Spital is the most punctual at 95.2% and Bromborough Rake the least at 85.6%, with Bromborough on 88.3%.
Bromborough takes its name from a town called Bromborough, home to about 14,850 people, and the station stands 1.7 km from its centre.
Across the whole run of data, the weakest four-week period for Bromborough was Period 9 of 2024-25, at 79.6%, some time before the latest year. The strongest was Period 7 of 2026-27, at 93.6%, and the two are 14.0 percentage points apart. Cancellations peaked at 8.1% of scheduled stops in Period 11 of 2024-25, against 3.6% over the latest 13 periods.
Compared with 3 stations of a similar size in North West, Bromborough is the most punctual, at 88.3%. The comparison group includes Bebington (88.0%), Eastham Rake (88.2%) and Port Sunlight (88.0%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Merseyrail | 66,911 | 88.3% | 3.6% |
Operators with their own page for this station are linked to it.
Late train at Bromborough? Delay Repay
These operators call at Bromborough and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 5,192 | 93.6% | 1.4% |
| Period 6 of 2026-27 | 5,090 | 88.1% | 5.7% |
| Period 5 of 2026-27 | 5,087 | 87.9% | 4.0% |
| Period 4 of 2026-27 | 4,771 | 84.6% | 5.0% |
| Period 3 of 2026-27 | 5,086 | 87.8% | 4.1% |
| Period 2 of 2026-27 | 5,090 | 89.8% | 2.6% |
| Period 1 of 2026-27 | 5,846 | 88.6% | 2.4% |
| Period 13 of 2025-26 | 5,596 | 87.8% | 3.1% |
| Period 12 of 2025-26 | 5,088 | 83.8% | 5.1% |
| Period 11 of 2025-26 | 5,084 | 86.3% | 6.2% |
| Period 10 of 2025-26 | 4,688 | 90.4% | 1.5% |
| Period 9 of 2025-26 | 5,143 | 87.4% | 1.7% |
| Period 8 of 2025-26 | 5,150 | 90.7% | 3.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Bebington | 66,911 | 88.0% | 3.6% |
| Eastham Rake | 66,871 | 88.2% | 3.6% |
| Port Sunlight | 66,871 | 88.0% | 3.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out