Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Grand Central at Bradford Interchange

All trains at Bradford InterchangeGrand Central across BritainYorkshire and The Humber

On time, last 13 periods68.1%Whole station: 69.8%
Cancelled2.2%Whole station: 3.3%
Scheduled stops2,826Of 65,259 at the station

How this operator is doing here

Grand Central had 2,826 scheduled stops at Bradford Interchange in the 13 periods to Period 7 of 2026-27, 4% of the station's total. 68.1% of recorded arrivals came within three minutes and 2.2% of stops were cancelled.

Grand Central trains at Bradford Interchange also serve Low Moor (4.5 km south, 65.0% on time, 2.6% cancelled), Halifax (10.4 km south-west, 64.9% on time, 2.4% cancelled), Brighouse (10.5 km south, 61.8% on time, 2.3% cancelled), Mirfield (13.7 km south, 59.1% on time, 2.3% cancelled), Wakefield Westgate (20.0 km south-east, – on time, – cancelled) and Wakefield Kirkgate (21.2 km south-east, 60.3% on time, 2.0% cancelled), which are the stations on its network closest to Bradford Interchange.

The busiest Grand Central station within 30 km of Bradford Interchange is Wakefield Kirkgate, 21.2 km south-east, with about 8 scheduled stops a day.

Of the 2 operators with enough records at Bradford Interchange, Grand Central is the least punctual, at 68.1%.

Bradford Interchange is the most punctual station on the Grand Central network, out of 17 ranked stations: 68.1% here against 62.2% across the whole network, which is 5.9 percentage points better.

Cancellations of Grand Central at Bradford Interchange are near its usual level: 2.2% of scheduled stops, against 2.3% across its network and 3.3% for every operator at the station.

Period by period

60%80%2023-242024-252025-262026-27Period 1 of 2023-24: 77.6%Period 2 of 2023-24: 78.9%Period 3 of 2023-24: 74.1%Period 4 of 2023-24: 77.2%Period 5 of 2023-24: 71.7%Period 6 of 2023-24: 72.3%Period 7 of 2023-24: 67.4%Period 8 of 2023-24: 64.5%Period 9 of 2023-24: 59.4%Period 10 of 2023-24: 50.3%Period 11 of 2023-24: 65.9%Period 12 of 2023-24: 66.7%Period 13 of 2023-24: 71.7%Period 1 of 2024-25: 74.6%Period 2 of 2024-25: 68.3%Period 3 of 2024-25: 70.8%Period 4 of 2024-25: 67.9%Period 5 of 2024-25: 67.3%Period 6 of 2024-25: 68.3%Period 7 of 2024-25: 64.5%Period 8 of 2024-25: 64.3%Period 9 of 2024-25: 54.0%Period 10 of 2024-25: 64.8%Period 11 of 2024-25: 63.7%Period 12 of 2024-25: 68.6%Period 13 of 2024-25: 76.8%Period 1 of 2025-26: 71.4%Period 2 of 2025-26: 72.1%Period 3 of 2025-26: 70.1%Period 4 of 2025-26: 71.8%Period 5 of 2025-26: 64.8%Period 6 of 2025-26: 68.2%Period 7 of 2025-26: 64.6%Period 8 of 2025-26: 69.1%Period 9 of 2025-26: 57.5%Period 10 of 2025-26: 72.9%Period 11 of 2025-26: 75.7%Period 12 of 2025-26: 70.7%Period 13 of 2025-26: 72.5%Period 1 of 2026-27: 66.9%Period 2 of 2026-27: 72.8%Period 3 of 2026-27: 65.9%Period 4 of 2026-27: 60.5%Period 5 of 2026-27: 64.5%Period 6 of 2026-27: 70.8%Period 7 of 2026-27: 65.6%
This pageGreat Britain
0%5%10%15%Period 1 of 2023-24: 10.3%Period 2 of 2023-24: 7.6%Period 3 of 2023-24: 4.8%Period 4 of 2023-24: 3.2%Period 5 of 2023-24: 5.9%Period 6 of 2023-24: 10.9%Period 7 of 2023-24: 6.3%Period 8 of 2023-24: 5.7%Period 9 of 2023-24: 6.0%Period 10 of 2023-24: 5.1%Period 11 of 2023-24: 6.8%Period 12 of 2023-24: 4.5%Period 13 of 2023-24: 1.9%Period 1 of 2024-25: 0.9%Period 2 of 2024-25: 5.9%Period 3 of 2024-25: 0.9%Period 4 of 2024-25: 2.7%Period 5 of 2024-25: 3.1%Period 6 of 2024-25: 3.7%Period 7 of 2024-25: 3.2%Period 8 of 2024-25: 3.7%Period 9 of 2024-25: 2.9%Period 10 of 2024-25: 4.9%Period 11 of 2024-25: 4.0%Period 12 of 2024-25: 1.0%Period 13 of 2024-25: 3.4%Period 1 of 2025-26: 1.9%Period 2 of 2025-26: 3.4%Period 3 of 2025-26: 2.3%Period 4 of 2025-26: 1.8%Period 5 of 2025-26: 6.3%Period 6 of 2025-26: 1.4%Period 7 of 2025-26: 0.4%Period 8 of 2025-26: 3.1%Period 9 of 2025-26: 3.8%Period 10 of 2025-26: 2.0%Period 11 of 2025-26: 0.9%Period 12 of 2025-26: 1.1%Period 13 of 2025-26: 1.3%Period 1 of 2026-27: 1.2%Period 2 of 2026-27: 3.7%Period 3 of 2026-27: 1.8%Period 4 of 2026-27: 1.8%Period 5 of 2026-27: 1.8%Period 6 of 2026-27: 0.9%Period 7 of 2026-27: 5.0%2023-242024-252025-262026-27

See how Grand Central Delay Repay works

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-2722065.6%5.0%
Period 6 of 2026-2721470.8%0.9%
Period 5 of 2026-2722464.5%1.8%
Period 4 of 2026-2722460.5%1.8%
Period 3 of 2026-2722465.9%1.8%
Period 2 of 2026-2721472.8%3.7%
Period 1 of 2026-2725466.9%1.2%
Period 13 of 2025-2623272.5%1.3%
Period 12 of 2025-2617670.7%1.1%
Period 11 of 2025-2621675.7%0.9%
Period 10 of 2025-2619672.9%2.0%
Period 9 of 2025-2620857.5%3.8%
Period 8 of 2025-2622469.1%3.1%

Time of year

60%70%80%90%P1: 72.3%1P2: 72.8%2P3: 69.9%3P4: 68.7%4P5: 66.8%5P6: 69.7%6P7: 65.4%7P8: 66.0%8P9: 57.0%9P10: 63.1%10P11: 68.8%11P12: 68.7%12P13: 73.7%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Other operators at Bradford Interchange

OperatorScheduled stopsWithin 3 minCancelled
Northern62,43369.9%3.3%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out