CrossCountry at Bodmin Parkway
All trains at Bodmin ParkwayCrossCountry across BritainSouth West
How this operator is doing here
CrossCountry had 1,445 scheduled stops at Bodmin Parkway in the 13 periods to Period 7 of 2026-27, 6% of the station's total. 58.9% of recorded arrivals came within three minutes and 11.7% of stops were cancelled.
CrossCountry trains at Bodmin Parkway also serve Lostwithiel (4.3 km south, 57.1% on time, 11.5% cancelled), Par (10.4 km south, 56.6% on time, 10.7% cancelled), Liskeard (13.7 km east, 55.3% on time, 11.6% cancelled), St Austell (14.8 km south-west, 59.5% on time, 12.2% cancelled), Truro (34.9 km south-west, 56.4% on time, 12.9% cancelled) and Plymouth (37.6 km east, 69.8% on time, 7.5% cancelled), which are the stations on its network closest to Bodmin Parkway.
The busiest CrossCountry station within 30 km of Bodmin Parkway is Liskeard, 13.7 km east, with about 4 scheduled stops a day.
Of the 2 operators with enough records at Bodmin Parkway, CrossCountry is the least punctual, at 58.9%.
CrossCountry at Bodmin Parkway has slipped sharply. 58.9% of stops came within three minutes of the timetable in the latest 13 periods, 9.5 percentage points worse than the 68.4% recorded in the 13 before. Cancellations held steady at 11.7% of scheduled stops, against 11.9% before.
CrossCountry at Bodmin Parkway has not moved in one direction over three full railway years: 69.6% within three minutes in 2023-24, 74.1% in 2024-25 and 65.5% in 2025-26.
Period by period
See how CrossCountry Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 120 | 70.9% | 14.2% |
| Period 6 of 2026-27 | 120 | 51.5% | 14.2% |
| Period 5 of 2026-27 | 117 | 44.7% | 12.0% |
| Period 4 of 2026-27 | 120 | 44.7% | 14.2% |
| Period 3 of 2026-27 | 108 | 51.0% | 5.6% |
| Period 2 of 2026-27 | 112 | 48.5% | 9.8% |
| Period 1 of 2026-27 | 120 | 63.7% | 5.8% |
| Period 13 of 2025-26 | 114 | 74.8% | 6.1% |
| Period 12 of 2025-26 | 104 | 71.0% | 3.8% |
| Period 11 of 2025-26 | 104 | 63.3% | 24.0% |
| Period 10 of 2025-26 | 96 | 55.3% | 20.8% |
| Period 9 of 2025-26 | 94 | 63.7% | 14.9% |
| Period 8 of 2025-26 | 116 | 62.3% | 8.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Bodmin Parkway
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 21,045 | 70.1% | 5.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out