Blundellsands and Crosby
BLNNorth WestManaged by Merseyrail
How this station is performing
Blundellsands and Crosby had 48,950 scheduled stops to Period 7 of 2026-27, about 134 a day. 93.6% of recorded arrivals were within three minutes of the timetable and 1.2% of scheduled stops were cancelled.
Blundellsands and Crosby opened on 24 July 1848, 178 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Blundellsands and Crosby is the oldest; the next oldest, Waterloo (Merseyside), dates from 1848.
The nearest stations to Blundellsands and Crosby are Hall Road (1.3 km north-west), Waterloo (Merseyside) (1.7 km south-east), Seaforth and Litherland (3.4 km south-east), Hightown (4.3 km north) and Bootle New Strand (4.9 km south-east). 29 stations lie within 10 km in all. Of the five, Bootle New Strand is the most punctual at 93.8% and Seaforth and Litherland the least at 92.2%, with Blundellsands and Crosby on 93.6%.
Blundellsands and Crosby is named after Blundellsands, a suburb, home to about 11,514 people, but the station stands 0.5 km from its centre.
1 of 3 stations of a similar size in North West are more punctual than Blundellsands and Crosby on 93.6%. The comparison group includes Birkdale (92.8%), Ainsdale (92.1%) and Bootle Oriel Road (94.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Merseyrail | 48,950 | 93.6% | 1.2% |
Operators with their own page for this station are linked to it.
Late train at Blundellsands and Crosby? Delay Repay
These operators call at Blundellsands and Crosby and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,709 | 95.7% | 1.3% |
| Period 6 of 2026-27 | 3,788 | 96.2% | 1.0% |
| Period 5 of 2026-27 | 3,852 | 94.0% | 1.4% |
| Period 4 of 2026-27 | 3,555 | 90.3% | 1.2% |
| Period 3 of 2026-27 | 3,784 | 94.5% | 0.7% |
| Period 2 of 2026-27 | 3,710 | 94.4% | 1.1% |
| Period 1 of 2026-27 | 4,288 | 93.5% | 1.1% |
| Period 13 of 2025-26 | 4,060 | 94.0% | 1.1% |
| Period 12 of 2025-26 | 3,709 | 93.7% | 1.0% |
| Period 11 of 2025-26 | 3,715 | 93.7% | 1.0% |
| Period 10 of 2025-26 | 3,356 | 92.5% | 1.5% |
| Period 9 of 2025-26 | 3,705 | 92.5% | 1.1% |
| Period 8 of 2025-26 | 3,719 | 91.8% | 2.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Birkdale | 48,950 | 92.8% | 1.3% |
| Ainsdale | 48,939 | 92.1% | 1.2% |
| Bootle Oriel Road | 48,938 | 94.5% | 1.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out