East Midlands Railway at Birchwood
All trains at BirchwoodEast Midlands Railway across BritainNorth West
How this operator is doing here
East Midlands Railway had 897 scheduled stops at Birchwood in the 13 periods to Period 7 of 2026-27, 3% of the station's total. 68.6% of recorded arrivals came within three minutes and 6.9% of stops were cancelled.
East Midlands Railway trains at Birchwood also serve Warrington Central (5.0 km south-west, 62.0% on time, 6.5% cancelled), Widnes (14.3 km west, 59.8% on time, 6.5% cancelled), Hough Green (17.2 km west, – on time, – cancelled), Manchester Oxford Road (19.9 km east, 44.8% on time, 4.9% cancelled), Manchester Piccadilly (20.8 km east, 47.7% on time, 4.7% cancelled) and Hunts Cross (22.7 km west, – on time, – cancelled), which are the stations on its network closest to Birchwood.
Within 30 km of here, East Midlands Railway runs best at Warrington Central, 5.0 km south-west (62.0%), and worst at Manchester Oxford Road, 19.9 km east (44.8%).
The busiest East Midlands Railway station within 30 km of Birchwood is Manchester Piccadilly, 20.8 km east, with about 29 scheduled stops a day.
East Midlands Railway ranks 2nd of the 3 operators with enough records at Birchwood, on 68.6%.
For East Midlands Railway, Birchwood is the 88th best of 114 ranked stations. Its 68.6% here is 6.0 percentage points below the 74.6% across the whole network.
Period by period
See how East Midlands Railway Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 72 | 62.7% | 5.6% |
| Period 6 of 2026-27 | 72 | 65.2% | 8.3% |
| Period 5 of 2026-27 | 64 | 65.5% | 9.4% |
| Period 4 of 2026-27 | 64 | 71.2% | 7.8% |
| Period 3 of 2026-27 | 72 | 70.1% | 6.9% |
| Period 2 of 2026-27 | 70 | 66.2% | 7.1% |
| Period 1 of 2026-27 | 84 | 69.7% | 9.5% |
| Period 13 of 2025-26 | 72 | 74.6% | 6.9% |
| Period 12 of 2025-26 | 51 | – | – |
| Period 11 of 2025-26 | 68 | 79.4% | 0.0% |
| Period 10 of 2025-26 | 65 | 72.1% | 6.2% |
| Period 9 of 2025-26 | 71 | 56.5% | 12.7% |
| Period 8 of 2025-26 | 72 | 69.0% | 1.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Birchwood
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 15,801 | 71.9% | 3.6% |
| TransPennine Express | 12,661 | 64.8% | 6.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out