Birchwood
BWDNorth WestManaged by Northern Trains
How this station is performing
Birchwood had 29,359 scheduled stops to Period 7 of 2026-27, about 81 a day. 68.8% of recorded arrivals were within three minutes of the timetable and 5.1% of scheduled stops were cancelled.
Birchwood opened on 31 July 1981, 45 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Birchwood is the newest; the oldest, Warrington Bank Quay, opened in 1832.
The nearest stations to Birchwood are Padgate (2.2 km west), Glazebrook (4.6 km east), Warrington Central (5.0 km south-west), Warrington Bank Quay (6.0 km south-west) and Irlam (6.6 km east). 10 stations lie within 10 km in all. Of the five, Padgate is the most punctual at 70.5% and Warrington Bank Quay the least at 59.1%, with Birchwood on 68.8%.
Birchwood is one of 4 stations named after a suburb called Birchwood, home to about 11,395 people; this one stands 0.5 km from its centre.
3 operators call at Birchwood: Northern (71.9%, 54% of stops), TransPennine Express (64.8%, 43% of stops) and East Midlands Railway (68.6%, 3% of stops). The operator you travel with matters: Northern reaches 71.9% within three minutes while TransPennine Express manages 64.8%, a gap of 7.1 percentage points.
Compared with 3 stations of a similar size in North West, Birchwood is the least punctual, at 68.8%. All of them are ahead, including Helsby (77.2%), Frodsham (77.8%) and Lea Green (70.4%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 15,801 | 71.9% | 3.6% |
| TransPennine Express | 12,661 | 64.8% | 6.9% |
| East Midlands Railway | 897 | 68.6% | 6.9% |
Operators with their own page for this station are linked to it.
Late train at Birchwood? Delay Repay
These operators call at Birchwood and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,238 | 70.6% | 3.8% |
| Period 6 of 2026-27 | 2,237 | 70.1% | 4.5% |
| Period 5 of 2026-27 | 2,236 | 68.8% | 6.8% |
| Period 4 of 2026-27 | 2,226 | 68.1% | 5.9% |
| Period 3 of 2026-27 | 2,231 | 62.7% | 4.7% |
| Period 2 of 2026-27 | 2,251 | 70.1% | 6.0% |
| Period 1 of 2026-27 | 2,565 | 72.8% | 4.5% |
| Period 13 of 2025-26 | 2,465 | 73.8% | 3.0% |
| Period 12 of 2025-26 | 2,233 | 74.1% | 3.1% |
| Period 11 of 2025-26 | 2,185 | 70.4% | 3.4% |
| Period 10 of 2025-26 | 2,031 | 65.1% | 9.0% |
| Period 9 of 2025-26 | 2,232 | 59.7% | 6.8% |
| Period 8 of 2025-26 | 2,229 | 66.0% | 5.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out