West Midlands Railway at Bilbrook
All trains at BilbrookWest Midlands Railway across BritainWest Midlands
How this operator is doing here
West Midlands Railway had 12,744 scheduled stops at Bilbrook in the 13 periods to Period 7 of 2026-27, 96% of the station's total. 71.6% of recorded arrivals came within three minutes and 4.0% of stops were cancelled.
West Midlands Railway trains at Bilbrook also serve Codsall (1.1 km west, 72.8% on time, 3.9% cancelled), Albrighton (5.7 km west, 75.0% on time, 3.9% cancelled), Wolverhampton (6.0 km south-east, 71.9% on time, 3.3% cancelled), Cosford (8.0 km west, 77.4% on time, 3.9% cancelled), Coseley (11.1 km south-east, 75.1% on time, 3.3% cancelled) and Bloxwich North (11.5 km east, 93.7% on time, 2.6% cancelled), which are the stations on its network closest to Bilbrook.
Within 30 km of here, West Midlands Railway runs best at Stourbridge Town, 19.0 km south (100.0%), and worst at Penkridge, 12.0 km north (57.1%).
The busiest West Midlands Railway station within 30 km of Bilbrook is Birmingham New Street, 25.4 km south-east, with about 532 scheduled stops a day.
West Midlands Railway at Bilbrook has slipped sharply. 71.6% of stops came within three minutes of the timetable in the latest 13 periods, 7.8 percentage points worse than the 79.4% recorded in the 13 before. Cancellations fell to 4.0% of scheduled stops from 6.0%, which is 2.0 percentage points fewer.
Period by period
See how West Midlands Railway Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,004 | 70.4% | 2.1% |
| Period 6 of 2026-27 | 1,004 | 70.2% | 2.9% |
| Period 5 of 2026-27 | 967 | 66.3% | 4.3% |
| Period 4 of 2026-27 | 903 | 58.9% | 4.7% |
| Period 3 of 2026-27 | 1,010 | 65.1% | 1.6% |
| Period 2 of 2026-27 | 892 | 73.6% | 12.3% |
| Period 1 of 2026-27 | 1,087 | 77.9% | 2.6% |
| Period 13 of 2025-26 | 1,068 | 79.6% | 3.7% |
| Period 12 of 2025-26 | 938 | 83.1% | 2.1% |
| Period 11 of 2025-26 | 957 | 80.5% | 7.1% |
| Period 10 of 2025-26 | 913 | 76.0% | 2.5% |
| Period 9 of 2025-26 | 1,004 | 61.6% | 1.7% |
| Period 8 of 2025-26 | 997 | 67.9% | 5.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Bilbrook
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 515 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out