Southeastern at Bexleyheath
How this operator is doing here
Southeastern had 66,481 scheduled stops at Bexleyheath in the 13 periods to Period 7 of 2026-27, 99% of the station's total. 84.1% of recorded arrivals came within three minutes and 2.0% of stops were cancelled.
Southeastern trains at Bexleyheath also serve Barnehurst (1.8 km east, 85.8% on time, 2.0% cancelled), Welling (2.2 km west, 86.0% on time, 2.0% cancelled), Bexley (2.8 km south, 87.1% on time, 1.4% cancelled), Abbey Wood (3.2 km north, 92.0% on time, 1.6% cancelled), Albany Park (3.2 km south, 89.0% on time, 1.4% cancelled) and Belvedere (3.5 km north-east, 92.6% on time, 1.6% cancelled), which are the stations on its network closest to Bexleyheath.
Within 30 km of here, Southeastern runs best at Sundridge Park, 9.5 km south-west (99.4%), and worst at Hildenborough, 28.4 km south (70.3%).
The busiest Southeastern station within 30 km of Bexleyheath is London Bridge, 15.8 km west, with about 912 scheduled stops a day.
Of the 2 operators with enough records at Bexleyheath, Southeastern is the least punctual, at 84.1%.
For Southeastern, Bexleyheath ranks 78th of 173 stations and is typical: 84.1% here against 84.2% across the network, a difference of 0.1 percentage points.
Southeastern at Bexleyheath has not moved in one direction over three full railway years: 88.2% within three minutes in 2023-24, 83.6% in 2024-25 and 84.7% in 2025-26.
Period by period
See how Southeastern Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 4,984 | 84.3% | 1.5% |
| Period 6 of 2026-27 | 5,148 | 82.7% | 1.2% |
| Period 5 of 2026-27 | 4,708 | 82.6% | 2.7% |
| Period 4 of 2026-27 | 5,286 | 87.0% | 1.5% |
| Period 3 of 2026-27 | 5,377 | 82.8% | 3.1% |
| Period 2 of 2026-27 | 4,987 | 82.6% | 5.5% |
| Period 1 of 2026-27 | 6,065 | 87.3% | 1.9% |
| Period 13 of 2025-26 | 5,206 | 84.9% | 1.3% |
| Period 12 of 2025-26 | 5,553 | 84.6% | 1.6% |
| Period 11 of 2025-26 | 4,853 | 84.0% | 1.2% |
| Period 10 of 2025-26 | 4,110 | 85.4% | 1.7% |
| Period 9 of 2025-26 | 5,251 | 82.7% | 1.3% |
| Period 8 of 2025-26 | 4,953 | 81.6% | 1.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Bexleyheath
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 387 | 90.0% | 1.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out