Hull Trains at Beverley
All trains at BeverleyHull Trains across BritainYorkshire and The Humber
How this operator is doing here
Hull Trains had 1,316 scheduled stops at Beverley in the 13 periods to Period 7 of 2026-27, 5% of the station's total. 77.8% of recorded arrivals came within three minutes and 2.0% of stops were cancelled.
Hull Trains trains at Beverley also serve Cottingham (6.9 km south, 82.9% on time, 2.0% cancelled), Hull (12.0 km south-east, 71.6% on time, 0.6% cancelled), Brough (16.4 km south-west, 68.6% on time, 0.6% cancelled), Howden (30.0 km west, 62.3% on time, 1.0% cancelled), Goole (33.4 km south-west, – on time, – cancelled) and Selby (42.6 km west, 70.6% on time, 1.1% cancelled), which are the stations on its network closest to Beverley.
The busiest Hull Trains station within 30 km of Beverley is Brough, 16.4 km south-west, with about 13 scheduled stops a day.
Of the 2 operators with enough records at Beverley, Hull Trains is the most punctual, at 77.8%.
For Hull Trains, Beverley is the 2nd best of 10 ranked stations. Its 77.8% here is 9.6 percentage points above the 68.2% across the whole network.
Hull Trains at Beverley has edged up: 77.8% of stops came within three minutes of the timetable in the latest 13 periods, 1.8 percentage points better than the 76.0% of the 13 before. Cancellations fell to 2.0% of scheduled stops from 3.4%, which is 1.4 percentage points fewer.
Period by period
See how Hull Trains Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 104 | 76.9% | 0.0% |
| Period 6 of 2026-27 | 102 | 80.4% | 0.0% |
| Period 5 of 2026-27 | 104 | 74.5% | 5.8% |
| Period 4 of 2026-27 | 103 | 81.0% | 2.9% |
| Period 3 of 2026-27 | 104 | 72.8% | 1.0% |
| Period 2 of 2026-27 | 104 | 76.5% | 1.9% |
| Period 1 of 2026-27 | 120 | 78.8% | 1.7% |
| Period 13 of 2025-26 | 112 | 84.4% | 2.7% |
| Period 12 of 2025-26 | 88 | 82.6% | 2.3% |
| Period 11 of 2025-26 | 98 | 83.7% | 0.0% |
| Period 10 of 2025-26 | 90 | 82.2% | 0.0% |
| Period 9 of 2025-26 | 91 | 65.9% | 3.3% |
| Period 8 of 2025-26 | 96 | 69.6% | 4.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Beverley
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 24,951 | 72.5% | 3.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out