Southeastern had 56,247 scheduled stops at Belvedere in the 13 periods to Period 7 of 2026-27, 100% of the station's total. 92.6% of recorded arrivals came within three minutes and 1.6% of stops were cancelled.
Southeastern trains at Belvedere also serve Erith (1.9 km south-east, 92.2% on time, 1.6% cancelled), Abbey Wood (2.3 km west, 92.0% on time, 1.6% cancelled), Barnehurst (3.1 km south, 85.8% on time, 2.0% cancelled), Bexleyheath (3.5 km south-west, 84.1% on time, 2.0% cancelled), Slade Green (3.7 km south-east, 90.8% on time, 1.6% cancelled) and Welling (4.7 km south-west, 86.0% on time, 2.0% cancelled), which are the stations on its network closest to Belvedere.
Within 30 km of here, Southeastern runs best at Sundridge Park, 12.6 km south-west (99.4%), and worst at Sevenoaks, 24.1 km south (72.3%).
The busiest Southeastern station within 30 km of Belvedere is London Bridge, 16.6 km west, with about 912 scheduled stops a day.
Of the 1 operators with enough records at Belvedere, Southeastern is the most punctual, at 92.6%.
For Southeastern, Belvedere is the 24th best of 173 ranked stations. Its 92.6% here is 8.4 percentage points above the 84.2% across the whole network.
Over three full railway years Southeastern at Belvedere has improved each time, from 86.5% within three minutes in 2023-24 to 92.7% in 2024-25 and 93.4% in 2025-26.
Period by period
See how Southeastern Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 4,378 | 93.7% | 0.9% |
| Period 6 of 2026-27 | 4,360 | 92.4% | 0.8% |
| Period 5 of 2026-27 | 4,334 | 93.0% | 2.2% |
| Period 4 of 2026-27 | 4,389 | 93.1% | 1.6% |
| Period 3 of 2026-27 | 3,946 | 90.1% | 4.0% |
| Period 2 of 2026-27 | 4,207 | 91.6% | 2.5% |
| Period 1 of 2026-27 | 5,015 | 92.5% | 1.4% |
| Period 13 of 2025-26 | 4,797 | 92.4% | 1.2% |
| Period 12 of 2025-26 | 4,388 | 92.1% | 1.3% |
| Period 11 of 2025-26 | 4,238 | 94.6% | 1.2% |
| Period 10 of 2025-26 | 3,721 | 94.1% | 0.8% |
| Period 9 of 2025-26 | 4,311 | 91.7% | 1.3% |
| Period 8 of 2025-26 | 4,163 | 92.5% | 1.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.