How this operator is doing here
CrossCountry had 12,814 scheduled stops at Beeston in the 13 periods to Period 7 of 2026-27, 22% of the station's total. 75.5% of recorded arrivals came within three minutes and 7.3% of stops were cancelled.
CrossCountry trains at Beeston also serve Attenborough (2.3 km south-west, 90.8% on time, 5.8% cancelled), Nottingham (5.1 km north-east, 79.7% on time, 8.1% cancelled), Long Eaton (6.7 km south-west, 72.2% on time, 7.5% cancelled), Spondon (13.7 km west, 83.7% on time, 5.3% cancelled), Derby (17.1 km west, 65.0% on time, 5.4% cancelled) and Willington (25.1 km west, 72.2% on time, 6.5% cancelled), which are the stations on its network closest to Beeston.
Within 30 km of here, CrossCountry runs best at Nottingham, 5.1 km north-east (79.7%), and worst at Melton Mowbray, 28.0 km south-east (63.9%).
The busiest CrossCountry station within 30 km of Beeston is Derby, 17.1 km west, with about 103 scheduled stops a day.
Of the 2 operators with enough records at Beeston, CrossCountry is the least punctual, at 75.5%.
CrossCountry at Beeston has slipped a little, from 79.3% within three minutes in the previous 13 periods to 75.5% in the latest 13, a fall of 3.8 percentage points. Cancellations rose to 7.3% of scheduled stops from 5.7%, which is 1.6 percentage points more.
Period by period
See how CrossCountry Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,000 | 72.3% | 6.7% |
| Period 6 of 2026-27 | 982 | 72.7% | 5.3% |
| Period 5 of 2026-27 | 895 | 75.6% | 4.8% |
| Period 4 of 2026-27 | 918 | 70.5% | 8.3% |
| Period 3 of 2026-27 | 960 | 76.0% | 9.6% |
| Period 2 of 2026-27 | 1,000 | 77.1% | 11.5% |
| Period 1 of 2026-27 | 1,166 | 77.4% | 5.9% |
| Period 13 of 2025-26 | 1,084 | 77.8% | 5.8% |
| Period 12 of 2025-26 | 1,000 | 80.5% | 2.5% |
| Period 11 of 2025-26 | 967 | 83.6% | 5.7% |
| Period 10 of 2025-26 | 884 | 77.7% | 16.3% |
| Period 9 of 2025-26 | 997 | 67.7% | 8.8% |
| Period 8 of 2025-26 | 961 | 71.5% | 5.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Beeston
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| East Midlands Railway | 46,281 | 78.7% | 3.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out