Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

South Western Railway at Basingstoke

All trains at BasingstokeSouth Western Railway across BritainSouth East

On time, last 13 periods72.6%Whole station: 73.1%
Cancelled2.5%Whole station: 2.9%
Scheduled stops75,881Of 112,185 at the station

How this operator is doing here

South Western Railway had 75,881 scheduled stops at Basingstoke in the 13 periods to Period 7 of 2026-27, 68% of the station's total. 72.6% of recorded arrivals came within three minutes and 2.5% of stops were cancelled.

South Western Railway trains at Basingstoke also serve Hook (8.9 km east, 87.8% on time, 2.5% cancelled), Overton (12.0 km west, 81.6% on time, 2.2% cancelled), Winchfield (12.7 km east, 86.1% on time, 2.5% cancelled), Micheldever (15.3 km south-west, 65.6% on time, 2.5% cancelled), Alton (15.4 km south-east, 85.0% on time, 3.1% cancelled) and Whitchurch (Hampshire) (17.7 km west, 80.6% on time, 2.2% cancelled), which are the stations on its network closest to Basingstoke.

Within 30 km of here, South Western Railway runs best at Bagshot, 29.8 km east (97.0%), and worst at Micheldever, 15.3 km south-west (65.6%).

The busiest South Western Railway station within 30 km of Basingstoke is Aldershot, 23.0 km east, with about 194 scheduled stops a day.

South Western Railway at Basingstoke has slipped a little, from 77.5% within three minutes in the previous 13 periods to 72.6% in the latest 13, a fall of 4.9 percentage points. Cancellations held steady at 2.5% of scheduled stops, against 2.1% before.

Period by period

60%70%80%90%2023-242024-252025-262026-27Period 1 of 2023-24: 86.7%Period 2 of 2023-24: 87.4%Period 3 of 2023-24: 84.0%Period 4 of 2023-24: 81.4%Period 5 of 2023-24: 85.3%Period 6 of 2023-24: 82.6%Period 7 of 2023-24: 77.2%Period 8 of 2023-24: 73.6%Period 9 of 2023-24: 63.9%Period 10 of 2023-24: 77.5%Period 11 of 2023-24: 79.1%Period 12 of 2023-24: 86.1%Period 13 of 2023-24: 84.5%Period 1 of 2024-25: 84.3%Period 2 of 2024-25: 81.8%Period 3 of 2024-25: 75.5%Period 4 of 2024-25: 76.4%Period 5 of 2024-25: 78.5%Period 6 of 2024-25: 82.5%Period 7 of 2024-25: 73.6%Period 8 of 2024-25: 74.2%Period 9 of 2024-25: 57.3%Period 10 of 2024-25: 75.8%Period 11 of 2024-25: 72.7%Period 12 of 2024-25: 80.6%Period 13 of 2024-25: 83.8%Period 1 of 2025-26: 85.7%Period 2 of 2025-26: 82.8%Period 3 of 2025-26: 77.9%Period 4 of 2025-26: 72.6%Period 5 of 2025-26: 80.3%Period 6 of 2025-26: 81.9%Period 7 of 2025-26: 81.2%Period 8 of 2025-26: 71.9%Period 9 of 2025-26: 65.3%Period 10 of 2025-26: 74.5%Period 11 of 2025-26: 77.6%Period 12 of 2025-26: 81.6%Period 13 of 2025-26: 84.9%Period 1 of 2026-27: 78.0%Period 2 of 2026-27: 65.9%Period 3 of 2026-27: 76.9%Period 4 of 2026-27: 65.9%Period 5 of 2026-27: 67.5%Period 6 of 2026-27: 66.6%Period 7 of 2026-27: 65.4%
This pageGreat Britain
0%5%10%Period 1 of 2023-24: 8.4%Period 2 of 2023-24: 3.0%Period 3 of 2023-24: 2.3%Period 4 of 2023-24: 1.4%Period 5 of 2023-24: 1.6%Period 6 of 2023-24: 0.9%Period 7 of 2023-24: 1.1%Period 8 of 2023-24: 2.3%Period 9 of 2023-24: 6.8%Period 10 of 2023-24: 4.2%Period 11 of 2023-24: 1.8%Period 12 of 2023-24: 1.8%Period 13 of 2023-24: 4.3%Period 1 of 2024-25: 6.4%Period 2 of 2024-25: 1.6%Period 3 of 2024-25: 1.9%Period 4 of 2024-25: 2.4%Period 5 of 2024-25: 2.9%Period 6 of 2024-25: 2.1%Period 7 of 2024-25: 2.9%Period 8 of 2024-25: 1.0%Period 9 of 2024-25: 4.8%Period 10 of 2024-25: 2.9%Period 11 of 2024-25: 1.9%Period 12 of 2024-25: 0.7%Period 13 of 2024-25: 1.8%Period 1 of 2025-26: 1.1%Period 2 of 2025-26: 0.7%Period 3 of 2025-26: 2.1%Period 4 of 2025-26: 3.9%Period 5 of 2025-26: 3.7%Period 6 of 2025-26: 1.2%Period 7 of 2025-26: 2.0%Period 8 of 2025-26: 2.2%Period 9 of 2025-26: 1.8%Period 10 of 2025-26: 2.2%Period 11 of 2025-26: 1.9%Period 12 of 2025-26: 2.8%Period 13 of 2025-26: 1.5%Period 1 of 2026-27: 2.1%Period 2 of 2026-27: 5.3%Period 3 of 2026-27: 3.1%Period 4 of 2026-27: 3.1%Period 5 of 2026-27: 3.4%Period 6 of 2026-27: 1.1%Period 7 of 2026-27: 2.4%2023-242024-252025-262026-27

See how South Western Railway Delay Repay works

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-275,84665.4%2.4%
Period 6 of 2026-275,90766.6%1.1%
Period 5 of 2026-275,89667.5%3.4%
Period 4 of 2026-275,86465.9%3.1%
Period 3 of 2026-275,76176.9%3.1%
Period 2 of 2026-275,61965.9%5.3%
Period 1 of 2026-276,43678.0%2.1%
Period 13 of 2025-266,25584.9%1.5%
Period 12 of 2025-265,82381.6%2.8%
Period 11 of 2025-265,65677.6%1.9%
Period 10 of 2025-265,31274.5%2.2%
Period 9 of 2025-265,67365.3%1.8%
Period 8 of 2025-265,83371.9%2.2%

Time of year

60%70%80%90%P1: 83.3%1P2: 79.4%2P3: 78.5%3P4: 73.9%4P5: 77.8%5P6: 78.3%6P7: 74.3%7P8: 73.2%8P9: 62.1%9P10: 75.9%10P11: 76.4%11P12: 82.8%12P13: 84.4%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Other operators at Basingstoke

OperatorScheduled stopsWithin 3 minCancelled
Great Western Railway25,05981.7%3.6%
CrossCountry11,24557.8%3.8%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out