Barrow-in-Furness
BIFNorth WestManaged by Northern Trains
How this station is performing
Barrow-in-Furness had 19,631 scheduled stops to Period 7 of 2026-27, about 54 a day. 79.9% of recorded arrivals were within three minutes of the timetable and 3.3% of scheduled stops were cancelled.
Barrow-in-Furness opened on 24 August 1846, 180 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Barrow-in-Furness is the oldest; the next oldest, Dalton (Cumbria), dates from 1846.
The nearest stations to Barrow-in-Furness are Roose (2.1 km east), Dalton (Cumbria) (5.0 km north-east), Askam (7.9 km north), Millom (10.6 km north) and Ulverston (11.7 km north-east). 3 stations lie within 10 km in all. Of the five, Askam is the most punctual at 81.7% and Roose the least at 73.1%, with Barrow-in-Furness on 79.9%.
Barrow-in-Furness takes its name from a town called Barrow-in-Furness, home to about 55,489 people, and the station stands 0.9 km from its centre.
For Barrow-in-Furness, the weakest four-week period in the data is a recent one: Period 8 of 2025-26, when only 72.1% of stops arrived within three minutes of the timetable. The strongest was Period 1 of 2023-24, at 87.3%, which is 15.2 percentage points higher. Cancellations peaked at 14.2% of scheduled stops in Period 9 of 2023-24, against 3.3% over the latest 13 periods.
1 of 3 stations of a similar size in North West are more punctual than Barrow-in-Furness on 79.9%. The comparison group includes Carnforth (76.4%), Meols Cop (84.1%) and Burscough Bridge (75.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 19,631 | 79.9% | 3.3% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,512 | 80.5% | 1.7% |
| Period 6 of 2026-27 | 1,498 | 81.1% | 3.1% |
| Period 5 of 2026-27 | 1,512 | 79.2% | 3.2% |
| Period 4 of 2026-27 | 1,512 | 77.7% | 2.7% |
| Period 3 of 2026-27 | 1,491 | 77.9% | 2.7% |
| Period 2 of 2026-27 | 1,500 | 81.3% | 1.7% |
| Period 1 of 2026-27 | 1,657 | 85.3% | 1.1% |
| Period 13 of 2025-26 | 1,644 | 82.3% | 4.0% |
| Period 12 of 2025-26 | 1,518 | 79.4% | 2.9% |
| Period 11 of 2025-26 | 1,519 | 84.9% | 2.3% |
| Period 10 of 2025-26 | 1,285 | 80.2% | 9.2% |
| Period 9 of 2025-26 | 1,494 | 75.1% | 5.8% |
| Period 8 of 2025-26 | 1,489 | 72.1% | 4.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Carnforth | 20,148 | 76.4% | 2.6% |
| Meols Cop | 20,448 | 84.1% | 4.0% |
| Burscough Bridge | 20,490 | 75.2% | 4.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out