Burscough Bridge
BCBNorth WestManaged by Northern Trains
How this station is performing
Burscough Bridge had 20,490 scheduled stops to Period 7 of 2026-27, about 56 a day. 75.2% of recorded arrivals were within three minutes of the timetable and 4.0% of scheduled stops were cancelled.
Burscough Bridge opened on 9 April 1855, 171 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Burscough Junction is the oldest (1849) and Hoscar the newest (1870), with Burscough Bridge in between.
The nearest stations to Burscough Bridge are Burscough Junction (0.9 km south), New Lane (1.8 km west), Hoscar (2.6 km east), Rufford (3.9 km north-east) and Ormskirk (4.7 km south-west). 12 stations lie within 10 km in all. Of the five, Ormskirk is the most punctual at 94.1% and New Lane the least at 73.6%, with Burscough Bridge on 75.2%.
Burscough Bridge is named after Burscough, a Village, home to about 9,935 people, but the station stands 0.6 km from its centre.
Across the whole run of data, the weakest four-week period for Burscough Bridge was Period 9 of 2023-24, at 63.4%, some time before the latest year. The strongest was Period 1 of 2023-24, at 93.1%, and the two are 29.7 percentage points apart. Cancellations peaked at 12.8% of scheduled stops in Period 6 of 2024-25, against 4.0% over the latest 13 periods.
2 of 3 stations of a similar size in North West are more punctual than Burscough Bridge on 75.2%. The comparison group includes Parbold (77.7%), Meols Cop (84.1%) and Mills Hill (Manchester) (70.0%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 20,490 | 75.2% | 4.0% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,596 | 76.4% | 2.6% |
| Period 6 of 2026-27 | 1,580 | 75.7% | 2.8% |
| Period 5 of 2026-27 | 1,243 | 73.0% | 7.7% |
| Period 4 of 2026-27 | 1,629 | 73.6% | 2.9% |
| Period 3 of 2026-27 | 1,437 | 76.6% | 2.6% |
| Period 2 of 2026-27 | 1,596 | 77.8% | 3.3% |
| Period 1 of 2026-27 | 1,852 | 78.3% | 2.3% |
| Period 13 of 2025-26 | 1,739 | 76.9% | 5.5% |
| Period 12 of 2025-26 | 1,596 | 77.5% | 5.3% |
| Period 11 of 2025-26 | 1,596 | 79.0% | 3.3% |
| Period 10 of 2025-26 | 1,457 | 73.4% | 6.3% |
| Period 9 of 2025-26 | 1,577 | 65.8% | 4.5% |
| Period 8 of 2025-26 | 1,592 | 72.4% | 3.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Parbold | 20,490 | 77.7% | 4.0% |
| Meols Cop | 20,448 | 84.1% | 4.0% |
| Mills Hill (Manchester) | 20,659 | 70.0% | 4.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out