c2c at Barking
How this operator is doing here
c2c had 106,578 scheduled stops at Barking in the 13 periods to Period 7 of 2026-27, 68% of the station's total. 91.6% of recorded arrivals came within three minutes and 2.0% of stops were cancelled.
c2c trains at Barking also serve Woodgrange Park (2.6 km west, – on time, – cancelled), Dagenham Dock (4.8 km east, 92.5% on time, 2.6% cancelled), West Ham (5.3 km west, 90.9% on time, 2.1% cancelled), Stratford (London) (5.7 km west, 85.7% on time, 5.0% cancelled), Rainham (Essex) (8.1 km east, 92.5% on time, 2.6% cancelled) and Limehouse (8.7 km west, 91.0% on time, 2.0% cancelled), which are the stations on its network closest to Barking.
Within 30 km of here, c2c runs best at Dagenham Dock, 4.8 km east (92.5%), and worst at London Liverpool Street, 11.4 km west (85.5%).
The busiest c2c station within 30 km of Barking is London Fenchurch Street, 11.3 km west, with about 292 scheduled stops a day.
Of the 2 operators with enough records at Barking, c2c is the least punctual, at 91.6%.
For c2c, Barking is the 6th best of 28 ranked stations. Its 91.6% here is 2.1 percentage points above the 89.5% across the whole network.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 8,351 | 85.3% | 1.7% |
| Period 6 of 2026-27 | 7,047 | 82.7% | 4.5% |
| Period 5 of 2026-27 | 7,449 | 87.5% | 2.4% |
| Period 4 of 2026-27 | 8,496 | 92.7% | 3.7% |
| Period 3 of 2026-27 | 7,823 | 91.8% | 2.2% |
| Period 2 of 2026-27 | 8,173 | 93.6% | 2.7% |
| Period 1 of 2026-27 | 9,306 | 93.9% | 1.5% |
| Period 13 of 2025-26 | 9,305 | 95.4% | 1.0% |
| Period 12 of 2025-26 | 8,301 | 94.6% | 1.3% |
| Period 11 of 2025-26 | 8,297 | 94.8% | 0.7% |
| Period 10 of 2025-26 | 7,403 | 91.0% | 2.0% |
| Period 9 of 2025-26 | 8,344 | 92.7% | 0.9% |
| Period 8 of 2025-26 | 8,283 | 92.0% | 1.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Barking
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| London Overground | 49,796 | 94.3% | 3.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out