Attleborough
ATLEast of EnglandManaged by Greater Anglia
How this station is performing
Attleborough had 14,860 scheduled stops to Period 7 of 2026-27, about 41 a day. 74.0% of recorded arrivals were within three minutes of the timetable and 1.7% of scheduled stops were cancelled.
Attleborough opened on 30 July 1845, 181 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Attleborough is the oldest; the next oldest, Spooner Row, dates from 1845.
The nearest stations to Attleborough are Spooner Row (4.9 km north-east), Eccles Road (6.0 km south-west), Wymondham (8.6 km north-east), Harling Road (10.2 km south-west) and Diss (17.1 km south-east). 3 stations lie within 10 km in all. Of the five, Diss is the most punctual at 90.7% and Wymondham the least at 72.0%, with Attleborough on 74.0%.
Attleborough is one of 2 stations named after a market town called Attleborough, home to about 12,163 people; this one stands 0.5 km from its centre.
2 operators call at Attleborough: Greater Anglia (78.0%, 87% of stops) and East Midlands Railway (46.5%, 13% of stops). The operator you travel with matters: Greater Anglia reaches 78.0% within three minutes while East Midlands Railway manages 46.5%, a gap of 31.5 percentage points.
2 of 3 stations of a similar size in East of England are more punctual than Attleborough on 74.0%. The comparison group includes Mistley (94.3%), Wrabness (91.9%) and Wymondham (72.0%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Greater Anglia | 12,878 | 78.0% | 0.9% |
| East Midlands Railway | 1,982 | 46.5% | 6.9% |
Operators with their own page for this station are linked to it.
Late train at Attleborough? Delay Repay
These operators call at Attleborough and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,096 | 57.2% | 1.2% |
| Period 6 of 2026-27 | 1,222 | 48.7% | 2.1% |
| Period 5 of 2026-27 | 1,171 | 70.2% | 2.0% |
| Period 4 of 2026-27 | 1,158 | 74.1% | 1.6% |
| Period 3 of 2026-27 | 1,175 | 78.8% | 2.1% |
| Period 2 of 2026-27 | 1,099 | 79.3% | 1.9% |
| Period 1 of 2026-27 | 1,282 | 80.7% | 1.2% |
| Period 13 of 2025-26 | 1,233 | 79.9% | 2.4% |
| Period 12 of 2025-26 | 1,140 | 83.8% | 2.3% |
| Period 11 of 2025-26 | 1,141 | 82.1% | 1.0% |
| Period 10 of 2025-26 | 1,004 | 79.2% | 1.1% |
| Period 9 of 2025-26 | 1,107 | 74.1% | 1.7% |
| Period 8 of 2025-26 | 1,032 | 74.4% | 1.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in East of England
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out