Wrabness
WRBEast of EnglandManaged by Greater Anglia
How this station is performing
Wrabness had 14,785 scheduled stops to Period 7 of 2026-27, about 41 a day. 91.9% of recorded arrivals were within three minutes of the timetable and 0.9% of scheduled stops were cancelled.
Wrabness opened on 15 August 1854, 172 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Manningtree is the oldest (1846) and Harwich International the newest (1883), with Wrabness in between.
The nearest stations to Wrabness are Harwich International (5.8 km east), Mistley (6.2 km west), Dovercourt (7.5 km east), Harwich Town (7.9 km east) and Manningtree (8.8 km west). 5 stations lie within 10 km in all. Of the five, Mistley is the most punctual at 94.3% and Manningtree the least at 91.7%, with Wrabness on 91.9%.
Wrabness takes its name from a Village called Wrabness, home to about 401 people, and the station stands 0.3 km from its centre.
For Wrabness, the weakest four-week period in the data is a recent one: Period 7 of 2026-27, when only 80.5% of stops arrived within three minutes of the timetable. The strongest was Period 13 of 2023-24, at 97.0%, which is 16.5 percentage points higher. Cancellations peaked at 5.1% of scheduled stops in Period 3 of 2026-27, against 0.9% over the latest 13 periods.
2 of 3 stations of a similar size in East of England are more punctual than Wrabness on 91.9%. The comparison group includes Mistley (94.3%), Wymondham (72.0%) and Harwich Town (93.6%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Greater Anglia | 14,785 | 91.9% | 0.9% |
Operators with their own page for this station are linked to it.
Late train at Wrabness? Delay Repay
These operators call at Wrabness and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,134 | 80.5% | 0.0% |
| Period 6 of 2026-27 | 1,125 | 86.9% | 1.2% |
| Period 5 of 2026-27 | 1,132 | 91.0% | 0.6% |
| Period 4 of 2026-27 | 1,132 | 93.7% | 1.3% |
| Period 3 of 2026-27 | 1,063 | 93.0% | 5.1% |
| Period 2 of 2026-27 | 1,122 | 94.5% | 0.3% |
| Period 1 of 2026-27 | 1,287 | 94.1% | 0.5% |
| Period 13 of 2025-26 | 1,248 | 94.9% | 0.9% |
| Period 12 of 2025-26 | 1,132 | 95.1% | 0.0% |
| Period 11 of 2025-26 | 1,132 | 93.6% | 0.3% |
| Period 10 of 2025-26 | 1,015 | 90.7% | 0.3% |
| Period 9 of 2025-26 | 1,130 | 92.9% | 0.5% |
| Period 8 of 2025-26 | 1,133 | 93.8% | 0.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in East of England
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Mistley | 14,786 | 94.3% | 0.9% |
| Wymondham | 14,750 | 72.0% | 1.6% |
| Harwich Town | 14,729 | 93.6% | 0.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out