Southeastern at Ashford International
All trains at Ashford InternationalSoutheastern across BritainSouth East
How this operator is doing here
Southeastern had 84,456 scheduled stops at Ashford International in the 13 periods to Period 7 of 2026-27, 87% of the station's total. 78.6% of recorded arrivals came within three minutes and 0.7% of stops were cancelled.
Southeastern trains at Ashford International also serve Wye (6.0 km north-east, 77.6% on time, 1.0% cancelled), Pluckley (9.1 km west, 72.8% on time, 1.1% cancelled), Charing (Kent) (9.3 km north-west, 80.8% on time, 1.3% cancelled), Westenhanger (12.6 km south-east, 82.9% on time, 1.0% cancelled), Chilham (13.3 km north-east, 80.3% on time, 1.0% cancelled) and Sandling (14.6 km south-east, 82.6% on time, 1.0% cancelled), which are the stations on its network closest to Ashford International.
Within 30 km of here, Southeastern runs best at Maidstone Barracks, 29.2 km north-west (95.2%), and worst at Teynham, 21.7 km north (67.8%).
The busiest Southeastern station within 30 km of Ashford International is Sittingbourne, 24.2 km north-west, with about 187 scheduled stops a day.
Of the 2 operators with enough records at Ashford International, Southeastern is the least punctual, at 78.6%.
Southeastern at Ashford International has slipped a little, from 81.6% within three minutes in the previous 13 periods to 78.6% in the latest 13, a fall of 3.0 percentage points. Cancellations held steady at 0.7% of scheduled stops, against 0.9% before.
Period by period
See how Southeastern Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 6,586 | 67.5% | 0.8% |
| Period 6 of 2026-27 | 6,546 | 63.6% | 1.3% |
| Period 5 of 2026-27 | 6,618 | 74.1% | 0.9% |
| Period 4 of 2026-27 | 6,535 | 80.2% | 0.8% |
| Period 3 of 2026-27 | 6,516 | 79.2% | 0.8% |
| Period 2 of 2026-27 | 6,038 | 81.4% | 0.9% |
| Period 1 of 2026-27 | 7,390 | 87.6% | 0.3% |
| Period 13 of 2025-26 | 7,118 | 85.7% | 0.7% |
| Period 12 of 2025-26 | 6,408 | 83.8% | 0.4% |
| Period 11 of 2025-26 | 6,427 | 83.2% | 0.8% |
| Period 10 of 2025-26 | 5,534 | 81.0% | 0.8% |
| Period 9 of 2025-26 | 6,373 | 76.4% | 0.8% |
| Period 8 of 2025-26 | 6,367 | 76.8% | 0.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Ashford International
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 12,587 | 79.4% | 4.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out