South Western Railway at Ash
All trains at AshSouth Western Railway across BritainSouth East
How this operator is doing here
South Western Railway had 23,128 scheduled stops at Ash in the 13 periods to Period 7 of 2026-27, 59% of the station's total. 92.4% of recorded arrivals came within three minutes and 2.2% of stops were cancelled.
South Western Railway trains at Ash also serve Ash Vale (2.6 km north, 91.2% on time, 2.2% cancelled), Wanborough (3.2 km east, 92.7% on time, 2.2% cancelled), Aldershot (3.3 km west, 90.7% on time, 2.1% cancelled), Farnborough (Main) (6.0 km north-west, 79.6% on time, 3.2% cancelled), Farnham (7.0 km south-west, 84.9% on time, 2.5% cancelled) and Frimley (7.3 km north, 96.7% on time, 2.5% cancelled), which are the stations on its network closest to Ash.
Within 30 km of here, South Western Railway runs best at Bagshot, 12.9 km north (97.0%), and worst at Basingstoke, 26.2 km west (72.6%).
The busiest South Western Railway station within 30 km of Ash is Woking, 13.2 km north-east, with about 435 scheduled stops a day.
Of the 2 operators with enough records at Ash, South Western Railway is the most punctual, at 92.4%.
For South Western Railway, Ash is the 16th best of 204 ranked stations. Its 92.4% here is 9.8 percentage points above the 82.6% across the whole network.
Period by period
See how South Western Railway Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,653 | 91.3% | 3.1% |
| Period 6 of 2026-27 | 1,814 | 89.2% | 1.8% |
| Period 5 of 2026-27 | 1,812 | 90.3% | 3.2% |
| Period 4 of 2026-27 | 1,781 | 92.4% | 1.9% |
| Period 3 of 2026-27 | 1,691 | 92.7% | 5.7% |
| Period 2 of 2026-27 | 1,812 | 93.4% | 3.9% |
| Period 1 of 2026-27 | 2,068 | 93.1% | 2.3% |
| Period 13 of 2025-26 | 1,961 | 95.0% | 0.7% |
| Period 12 of 2025-26 | 1,731 | 95.6% | 0.8% |
| Period 11 of 2025-26 | 1,813 | 95.4% | 0.4% |
| Period 10 of 2025-26 | 1,602 | 93.5% | 2.1% |
| Period 9 of 2025-26 | 1,626 | 90.8% | 0.6% |
| Period 8 of 2025-26 | 1,764 | 88.6% | 2.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Ash
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 16,208 | 79.2% | 6.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out