Angmering
ANGSouth EastManaged by Govia Thameslink Railway (Southern)
How this station is performing
Angmering had 67,601 scheduled stops to Period 7 of 2026-27, about 186 a day. 77.6% of recorded arrivals were within three minutes of the timetable and 3.6% of scheduled stops were cancelled.
Angmering opened on 16 March 1846, 180 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Angmering is the oldest; the next oldest, Goring-by-Sea, dates from 1846.
The nearest stations to Angmering are Goring-by-Sea (3.9 km east), Littlehampton (4.2 km west), Durrington-on-Sea (5.4 km east), Arundel (5.4 km north-west) and Ford (6.5 km west). 9 stations lie within 10 km in all. Of the five, Littlehampton is the most punctual at 83.3% and Arundel the least at 77.3%, with Angmering on 77.6%.
Angmering is one of 2 stations named after a Village called Angmering, home to about 8,866 people; this one stands 1.4 km from its centre.
For Angmering, the weakest four-week period in the data is a recent one: Period 6 of 2026-27, when only 70.2% of stops arrived within three minutes of the timetable. The strongest was Period 1 of 2023-24, at 87.2%, which is 17.0 percentage points higher.
1 of 3 stations of a similar size in South East are more punctual than Angmering on 77.6%. The comparison group includes Ford (80.5%), Sittingbourne (74.9%) and Ramsgate (77.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 67,601 | 77.6% | 3.6% |
Operators with their own page for this station are linked to it.
Late train at Angmering? Delay Repay
These operators call at Angmering and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 5,150 | 71.1% | 3.5% |
| Period 6 of 2026-27 | 5,173 | 70.2% | 3.9% |
| Period 5 of 2026-27 | 5,187 | 73.5% | 3.3% |
| Period 4 of 2026-27 | 5,215 | 78.1% | 2.4% |
| Period 3 of 2026-27 | 5,080 | 76.5% | 3.4% |
| Period 2 of 2026-27 | 5,184 | 78.1% | 6.5% |
| Period 1 of 2026-27 | 5,912 | 82.2% | 3.1% |
| Period 13 of 2025-26 | 5,547 | 83.8% | 3.8% |
| Period 12 of 2025-26 | 5,254 | 82.4% | 2.9% |
| Period 11 of 2025-26 | 5,137 | 83.0% | 3.5% |
| Period 10 of 2025-26 | 4,623 | 79.2% | 2.6% |
| Period 9 of 2025-26 | 5,120 | 72.9% | 4.4% |
| Period 8 of 2025-26 | 5,019 | 77.2% | 3.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Ford | 67,730 | 80.5% | 2.3% |
| Sittingbourne | 68,030 | 74.9% | 1.7% |
| Ramsgate | 68,258 | 77.5% | 1.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out