Northern at Althorpe
All trains at AlthorpeNorthern across BritainYorkshire and The Humber
How this operator is doing here
Northern had 5,036 scheduled stops at Althorpe in the 13 periods to Period 7 of 2026-27, 89% of the station's total. 87.6% of recorded arrivals came within three minutes and 1.3% of stops were cancelled.
Northern trains at Althorpe also serve Scunthorpe (5.4 km east, 91.8% on time, 1.3% cancelled), Crowle (5.6 km west, 87.2% on time, 1.3% cancelled), Kirton Lindsey (14.4 km south-east, – on time, – cancelled), Thorne South (14.8 km west, 87.9% on time, 1.2% cancelled), Saltmarshe (16.0 km north, 79.3% on time, 3.4% cancelled) and Thorne North (16.2 km west, 79.8% on time, 3.4% cancelled), which are the stations on its network closest to Althorpe.
Within 30 km of here, Northern runs best at Scunthorpe, 5.4 km east (91.8%), and worst at Brough, 18.8 km north-east (71.3%).
The busiest Northern station within 30 km of Althorpe is Doncaster, 27.8 km west, with about 159 scheduled stops a day.
Of the 2 operators with enough records at Althorpe, Northern is the most punctual, at 87.6%.
For Northern, Althorpe is the 63rd best of 493 ranked stations. Its 87.6% here is 9.0 percentage points above the 78.6% across the whole network.
Over three full railway years Northern at Althorpe has improved each time, from 85.5% within three minutes in 2023-24 to 85.8% in 2024-25 and 86.8% in 2025-26.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 384 | 89.2% | 1.3% |
| Period 6 of 2026-27 | 384 | 88.9% | 1.6% |
| Period 5 of 2026-27 | 384 | 87.2% | 0.0% |
| Period 4 of 2026-27 | 384 | 85.8% | 4.7% |
| Period 3 of 2026-27 | 384 | 90.8% | 1.0% |
| Period 2 of 2026-27 | 368 | 86.9% | 2.2% |
| Period 1 of 2026-27 | 448 | 90.7% | 1.3% |
| Period 13 of 2025-26 | 416 | 89.4% | 0.0% |
| Period 12 of 2025-26 | 384 | 89.5% | 1.0% |
| Period 11 of 2025-26 | 384 | 86.3% | 1.0% |
| Period 10 of 2025-26 | 348 | 84.3% | 1.1% |
| Period 9 of 2025-26 | 384 | 83.6% | 0.0% |
| Period 8 of 2025-26 | 384 | 84.9% | 1.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Althorpe
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| TransPennine Express | 611 | 57.1% | 0.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out