Northern at Alfreton
How this operator is doing here
Northern had 12,499 scheduled stops at Alfreton in the 13 periods to Period 7 of 2026-27, 53% of the station's total. 78.1% of recorded arrivals came within three minutes and 2.1% of stops were cancelled.
Northern trains at Alfreton also serve Langley Mill (9.6 km south, 75.3% on time, 2.2% cancelled), Ilkeston (14.4 km south, 73.2% on time, 2.2% cancelled), Chesterfield (15.6 km north, 79.1% on time, 1.9% cancelled), Nottingham (22.8 km south-east, 76.6% on time, 2.1% cancelled), Dronfield (23.2 km north, 77.1% on time, 1.7% cancelled) and Dore and Totley (27.0 km north, 72.2% on time, 2.0% cancelled), which are the stations on its network closest to Alfreton.
Within 30 km of here, Northern runs best at Kiveton Bridge, 27.5 km north (83.9%), and worst at Grindleford, 28.4 km north-west (71.8%).
The busiest Northern station within 30 km of Alfreton is Worksop, 28.6 km north-east, with about 40 scheduled stops a day.
Of the 2 operators with enough records at Alfreton, Northern is the most punctual, at 78.1%.
For Northern, Alfreton ranks 280th of 493 stations and is typical: 78.1% here against 78.6% across the network, a difference of 0.5 percentage points.
Northern at Alfreton has slipped a little, from 80.4% within three minutes in the previous 13 periods to 78.1% in the latest 13, a fall of 2.3 percentage points. Cancellations fell to 2.1% of scheduled stops from 3.5%, which is 1.4 percentage points fewer.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 970 | 82.5% | 1.4% |
| Period 6 of 2026-27 | 940 | 78.8% | 1.3% |
| Period 5 of 2026-27 | 810 | 77.7% | 1.2% |
| Period 4 of 2026-27 | 970 | 78.1% | 3.7% |
| Period 3 of 2026-27 | 969 | 75.0% | 2.9% |
| Period 2 of 2026-27 | 972 | 75.4% | 2.6% |
| Period 1 of 2026-27 | 1,112 | 81.5% | 1.2% |
| Period 13 of 2025-26 | 1,004 | 77.6% | 2.6% |
| Period 12 of 2025-26 | 968 | 81.4% | 1.2% |
| Period 11 of 2025-26 | 962 | 82.7% | 1.7% |
| Period 10 of 2025-26 | 882 | 76.6% | 1.6% |
| Period 9 of 2025-26 | 968 | 68.2% | 3.8% |
| Period 8 of 2025-26 | 972 | 78.2% | 2.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Alfreton
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| East Midlands Railway | 11,167 | 63.1% | 3.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out