Yorton
YRTWest MidlandsManaged by TfW Rail
How this station is performing
Yorton has usable figures for 1 of the last 13 four-week periods to Period 7 of 2026-27, covering 7,850 scheduled stops, about 22 a day. In those periods 86.0% of stops arrived within three minutes of the timetable and 1.9% of scheduled stops were cancelled.
Yorton opened on 1 September 1858, 168 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Yorton is the newest; the oldest, Shrewsbury, opened in 1848.
The nearest stations to Yorton are Wem (5.4 km north), Prees (10.6 km north), Shrewsbury (10.8 km south), Whitchurch (Shropshire) (18.2 km north) and Wellington (Shropshire) (19.0 km south-east). 1 stations lie within 10 km in all. At 86.0%, Yorton is more punctual than every one of them; the best of the five, Shrewsbury, manages 76.7%.
Yorton takes its name from a Village called Yorton, and the station stands 1.0 km from its centre.
Transport for Wales is the only operator serving Yorton. Here it manages 86.0% within three minutes, 1.0 percentage points better than its 85.0% across its whole network.
Yorton is a quiet station, ranked 2383rd for entries and exits in 2025-26, with about 9,880 of them. That is roughly 1 passengers for every scheduled stop.
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 7,850 | 86.0% | 1.9% |
Operators with their own page for this station are linked to it.
Late train at Yorton? Delay Repay
These operators call at Yorton and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 602 | – | 1.2% |
| Period 6 of 2026-27 | 537 | – | 5.2% |
| Period 5 of 2026-27 | 570 | – | 1.9% |
| Period 4 of 2026-27 | 595 | – | 2.7% |
| Period 3 of 2026-27 | 576 | – | 1.6% |
| Period 2 of 2026-27 | 608 | – | 1.5% |
| Period 1 of 2026-27 | 709 | 86.0% | 1.1% |
| Period 13 of 2025-26 | 673 | – | 1.2% |
| Period 12 of 2025-26 | 608 | – | 0.3% |
| Period 11 of 2025-26 | 571 | – | 2.8% |
| Period 10 of 2025-26 | 564 | – | 2.7% |
| Period 9 of 2025-26 | 618 | – | 2.4% |
| Period 8 of 2025-26 | 619 | – | 0.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out